首页 | 官方网站   微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   3篇
  免费   0篇
工业技术   3篇
  2021年   1篇
  2015年   1篇
  2014年   1篇
排序方式: 共有3条查询结果,搜索用时 8 毫秒
1
1.
2.
Instruments and Experimental Techniques - The use of a gas absorber based on porous titanium as a gas generator as part of a sealed electrovacuum device, that is, a plasma focus chamber, is...  相似文献   
3.
The time parameters of PBY-47 controlled vacuum spark-gap switches (CVSSs), which are high-current pulse switches that can pass pulse currents with amplitudes of up to several hundred amperes, were investigated. When using CVSSs, it is necessary to know their time parameters, such as the operation delay time and its spread (jitter). To study these parameters, a run of experiments was performed on a laboratory test bench with sinusoidal discharge-current pulses with an amplitude of 120 kA and a period of 17 μs. When multimodule power-supply systems are developed, special attention is drawn to the agreed parallel operation of the switches of discharge modules. To determine the main requirements that are imposed on the operation stability of multimodule power-supply systems, a criterion was developed that relates the inductance of the load to the inductance of discharge modules and the number of modules to such a property of the used switches as a wide range of the operating voltages.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号