首页 | 官方网站   微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 421 毫秒
1.
陈可嘉  王潇 《控制与决策》2013,28(10):1502-1506
针对两机无等待流水车间调度问题,提出目标函数最大完工时间最小化的快速算法,并给出算法的复杂度。分析两机无等待流水车间调度问题的排列排序性质,证明了两机无等待流水车间调度问题的可行解只存在于排列排序中,排列排序的最优解一定是两机无等待流水车间调度问题的最优解。最后研究了同时包含普通工件和无等待工件的两机流水车间调度问题的复杂性,为进一步研究两机无等待流水车间调度问题提供了理论依据。  相似文献   

2.
This paper is motivated by the problem of meeting due dates in a flowshop production environment with jobs with different weights and uncertain processing times. Enforcement of a permutation schedule to varying degrees for dynamic flowshops is investigated with the goal of minimizing total weighted tardiness (TWT). The approaches studied are categorized as follows: (1) pure permutation scheduling (2) shift-based scheduling (3) pure dispatching (which leads to non-permutation sequences). A simulation-based experimental study was carried out to study the performance of the above methods with respect to minimizing TWT when new jobs arrive to the flowshop at every shift change. Results indicate significant gains in performance are possible when the permutation requirement is relaxed and shift-based scheduling is allowed. Shift-based scheduling yields competitive results with respect to the pure dispatching approach, even though dispatching has the advantage of a full relaxation of the permutation requirement.  相似文献   

3.
In this paper, we analyze the two-machine flowshop problem with the makespan minimization and the learning effect, which computational complexity was not determined yet. First, we show that an optimal solution of this problem does not have to be the ‘permutation’ schedule if the learning effect is taken into consideration. Furthermore, it is proved that the permutation and non-permutation versions of this problem are NP-hard even if the learning effect, in a form of a step learning curve, characterizes only one machine. However, if both machines have learning ability and the learning curves are stepwise then the permutation version of this problem is strongly NP-hard. Furthermore, we prove the makespan minimization problem in m-machine permutation proportional flowshop environment remains polynomially solvable with identical job processing times on each machine even if they are described by arbitrary functions (learning curves) dependent on a job position in a sequence. Finally, approximation algorithms for the general problem are proposed and analyzed.  相似文献   

4.
This paper deals with the problem of preemptive scheduling in a two-stage flowshop with parallel unrelated machines at the first stage and a single machine at the second stage. At the first stage, jobs use some additional resources which are available in limited quantities at any time. The resource requirements are of 0–1 type. The objective is the minimization of makespan. The problem is NP-hard. Heuristic algorithms are proposed which solve to optimality the resource constrained scheduling problem at the first stage of the flowshop, and at the same time, minimize the makespan in the flowshop by selecting appropriate jobs for simultaneous processing. Several rules of job selection are considered. The performance of the proposed heuristic algorithms is analyzed by comparing solutions with the lower bound on the optimal makespan. The extensive computational experiment shows that the proposed heuristic algorithms are able to produce near-optimal solutions in short computational time.  相似文献   

5.
The scheduling problem in a multi-stage hybrid flowshop has been the subject of considerable research. All the studies on this subject assume that each job has to be processed on all the stages, i.e., there are no missing operations for a job at any stage. However, missing operations usually exist in many real-life production systems, such as a system in a stainless steel factory investigated in this note. The studied production system in the factory is composed of two stages in series. The first stage contains only one machine while the second stage consists of two identical machines (namely a 1 × 2 hybrid flowshop). In the system, some jobs have to be processed on both stages, but others need only to be processed on the second stage. Accordingly, the addressed scheduling problem is a 1 × 2 hybrid flowshop with missing operations at the first stage. In this note, we develop a heuristic for the problem to generate a non-permutation schedule (NPS) from a given permutation schedule, with the objective of minimizing the makespan. Computational results demonstrate that the heuristic can efficiently generate better NPS solutions.  相似文献   

6.
The general flowshop scheduling problem is a production problem where a set of n jobs have to be processed with identical flow pattern on m machines. In permutation flowshops the sequence of jobs is the same on all machines. A significant research effort has been devoted for sequencing jobs in a flowshop minimizing the makespan. This paper describes the application of a Constructive Genetic Algorithm (CGA) to makespan minimization on flowshop scheduling. The CGA was proposed recently as an alternative to traditional GA approaches, particularly, for evaluating schemata directly. The population initially formed only by schemata, evolves controlled by recombination to a population of well-adapted structures (schemata instantiation). The CGA implemented is based on the NEH classic heuristic and a local search heuristic used to define the fitness functions. The parameters of the CGA are calibrated using a Design of Experiments (DOE) approach. The computational results are compared against some other successful algorithms from the literature on Taillard’s well-known standard benchmark. The computational experience shows that this innovative CGA approach provides competitive results for flowshop scheduling problems.  相似文献   

7.
The most general flowshop scheduling problem is also addressed in the literature as non-permutation flowshop (NPFS). Current processors are able to cope with the \((n!)^{m}\) combinatorial complexity of NPFS scheduling by metaheuristics. After briefly discussing the requirements for a manufacturing layout to be designed and modeled as non-permutation flowshop, a disjunctive graph (digraph) approach is used to build native solutions. The implementation of an Ant Colony Optimization (ACO) algorithm has been described in detail; it has been shown how the biologically inspired mechanisms produce eligible schedules, as opposed to most metaheuristics approaches, which improve permutation solutions. ACO algorithms are an example of native non-permutation (NNP) solutions of the flowshop scheduling problem, opening a new perspective on building purely native approaches. The proposed NNP-ACO has been assessed over existing native approaches improving most makespan upper bounds of the benchmark problems from Demirkol et al. (1998).  相似文献   

8.
A common assumption in the classical permutation flowshop scheduling model is that each job is processed on each machine at most once. However, this assumption does not hold for a re-entrant flowshop in which a job may be operated by one or more machines many times. Given that the re-entrant permutation flowshop scheduling problem to minimize the makespan is very complex, we adopt the CPLEX solver and develop a memetic algorithm (MA) to tackle the problem. We conduct computational experiments to test the effectiveness of the proposed algorithm and compare it with two existing heuristics. The results show that CPLEX can solve mid-size problem instances in a reasonable computing time, and the proposed MA is effective in treating the problem and outperforms the two existing heuristics.  相似文献   

9.
In this paper, we study the problem of minimizing the weighted sum of makespan and total completion time in a permutation flowshop where the processing times are supposed to vary according to learning effects. The processing time of a job is a function of the sum of the logarithms of the processing times of the jobs already processed and its position in the sequence. We present heuristic algorithms, which are modified from the optimal schedules for the corresponding single machine scheduling problem and analyze their worst-case error bound. We also adopt an existing algorithm as well as a branch-and-bound algorithm for the general m-machine permutation flowshop problem. For evaluation of the performance of the algorithms, computational experiments are performed on randomly generated test problems.  相似文献   

10.
等待时间受限的置换流水车间调度问题要求工件在连续两个机器间的等待时间满足上限值约束.对此,分析了工件序列中相邻工件的加工持续时间及其上下界关系,并且提出一种启发式方法.首先,建立旅行商间题(TSP)以生成初始调度;然后,采用扩展插入方法优化调度解.为了衡量算法性能,给出问题下界的计算方法和相关评价指标,并通过数据实验验证了该启发式和下界计算方法的可行性和有效性.  相似文献   

11.
This work starts from modeling the scheduling of n jobs on m machines/stages as flowshop with buffers in manufacturing. A mixed-integer linear programing model is presented, showing that buffers of size n ? 2 allow permuting sequences of jobs between stages. This model is addressed in the literature as non-permutation flowshop scheduling (NPFS) and is described in this article by a disjunctive graph (digraph) with the purpose of designing specialized heuristic and metaheuristics algorithms for the NPFS problem. Ant colony optimization (ACO) with the biologically inspired mechanisms of learned desirability and pheromone rule is shown to produce natively eligible schedules, as opposed to most metaheuristics approaches, which improve permutation solutions found by other heuristics. The proposed ACO has been critically compared and assessed by computation experiments over existing native approaches. Most makespan upper bounds of the established benchmark problems from Taillard (1993) and Demirkol, Mehta, and Uzsoy (1998) with up to 500 jobs on 20 machines have been improved by the proposed ACO.  相似文献   

12.
Algorithms for a realistic variant of flowshop scheduling   总被引:1,自引:0,他引:1  
This paper deals with a realistic variant of flowshop scheduling, namely the hybrid flexible flowshop. A hybrid flowshop mixes the characteristics of regular flowshops and parallel machine problems by considering stages with parallel machines instead of having one single machine per stage. We also investigate the flexible version where stage skipping might occur, i.e., not all stages must be visited by all jobs. Lastly, we also consider job sequence dependent setup times per stage. The optimization criterion considered is makespan minimization. While many approaches for hybrid flowshops have been proposed, hybrid flexible flowshops have been rarely studied. The situation is even worse with the addition of sequence dependent setups. In this study, we propose two advanced algorithms that specifically deal with the flexible and setup characteristics of this problem. The first algorithm is a dynamic dispatching rule heuristic, and the second is an iterated local search metaheuristic. The proposed algorithms are evaluated by comparison against seven other high performing existing algorithms. The statistically sound results support the idea that the proposed algorithms are very competitive for the studied problem.  相似文献   

13.
Due to its simplicity yet powerful search ability, iterated local search (ILS) has been widely used to tackle a variety of single-objective combinatorial optimization problems. However, applying ILS to solve multi-objective combinatorial optimization problems is scanty. In this paper we design a multi-objective ILS (MOILS) to solve the multi-objective permutation flowshop scheduling problem with sequence-dependent setup times to minimize the makespan and total weighted tardiness of all jobs. In the MOILS, we design a Pareto-based variable depth search in the multi-objective local search phase. The search depth is dynamically adjusted during the search process of the MOILS to strike a balance between exploration and exploitation. We incorporate an external archive into the MOILS to store the non-dominated solutions and provide initial search points for the MOILS to escape from local optima traps. We compare the MOILS with several multi-objective evolutionary algorithms (MOEAs) shown to be effective for treating the multi-objective permutation flowshop scheduling problem in the literature. The computational results show that the proposed MOILS outperforms the MOEAs.  相似文献   

14.
The makespan distribution of permutation flowshop schedules has been a topic of debate for almost fifty years. Many researchers have confirmed or doubted the famous claim that the makespan distribution of permutation flowshop schedules is asymptotically normal if the number of jobs is sufficiently large. This paper theoretically and empirically investigates the makespan distribution of permutation flowshop schedules and shows that the normality claim is not valid for the job-dominated and machine-dominated flowshops. Errors in the proof of normality of the makespan distribution of permutation flowshop schedules are pointed out. It is shown that the makespan distribution of a permutation flowshop scheduling problem depends on the number of jobs as well as the number of machines.  相似文献   

15.
This paper considers a permutation flowshop problem with secondary resources with the objective of minimizing the number of tardy jobs. The number of secondary resources assigned to the machines (workcenters), as well as the allocation of resources among the various machines, will play a significant role in the time required to process each job by its specified due date. This problem finds application in a large number of environments including manufacturing, maintenance, warehousing operations, as well as in healthcare. The research presents a lower bound for the permutation flowshop problem and evaluates its performance against the optimal solution for small, medium, and large instances. Several heuristics, including neighborhood search and simulated annealing, are presented to generate the secondary resource assignment and the allocation of jobs to the schedule. The computational complexity of the lower bound and computational examples for the heuristics are discussed.  相似文献   

16.
In this paper, we address the problem of scheduling a set of jobs in a flowshop with makespan objective. In contrast to the usual assumption of machine availability presented in most research, we consider that machines may not be available at the beginning of the planning period, due to processing of previously scheduled jobs. We first formulate the problem, analyse the structure of solutions depending on a number of factors (such as machines, jobs, structure of the processing times, availability vectors, etc.), and compare it with its classical counterpart. Results indicate that the problem under consideration presents a different structure of solutions, and that it is easier than the classical permutation flowshop problem. In view of these results, we propose and test a number of fast heuristics for the problem.  相似文献   

17.
This paper focuses on the problem of scheduling jobs in a permutation flowshop with the objective of makespan minimisation subject to a maximum allowed tardiness for the jobs, a problem that combines two desirable manufacturing objectives related to machine utilisation and to customer satisfaction. Although several approximate algorithms have been proposed for this NP-hard problem, none of them can use the excellent speed-up method by Taillard (1990) [22] for makespan minimisation due to the special structure of the problem under consideration. In this paper, several properties of the problem are defined in order to be able to partly apply Taillard׳s acceleration. This mechanism, together with a novel feasible tabu local search method, allows us to further exploit the structure of solutions of the problem, and are incorporated in two proposed algorithms: a bounded-insertion-based constructive heuristic and an advanced non-population-based algorithm. These algorithms are compared with state-of-the-art algorithms under the same computer conditions. The results show that both algorithms improve existing ones and therefore, constitute the new state-of-art approximate solution procedures for the problem.  相似文献   

18.
Very recently, Pan et al. [Proceedings of the 9th Annual Conference on Genetic and Evolutionary Computation, GECCO07, pp. 126–33] presented a new and novel discrete differential evolution algorithm for the permutation flowshop scheduling problem with the makespan criterion. On the other hand, the iterated greedy algorithm is proposed by [Ruiz, R., & Stützle, T. (2007). A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem. European Journal of Operational Research, 177(3), 2033–49] for the permutation flowshop scheduling problem with the makespan criterion. However, both algorithms are not applied to the permutation flowshop scheduling problem with the total flowtime criterion. Based on their excellent performance with the makespan criterion, we extend both algorithms in this paper to the total flowtime objective. Furthermore, we propose a new and novel referenced local search procedure hybridized with both algorithms to further improve the solution quality. The referenced local search exploits the space based on reference positions taken from a reference solution in the hope of finding better positions for jobs when performing insertion operation. Computational results show that both algorithms with the referenced local search are either better or highly competitive to all the existing approaches in the literature for both objectives of makespan and total flowtime. Especially for the total flowtime criterion, their performance is superior to the particle swarm optimization algorithms proposed by [Tasgetiren, M. F., Liang, Y. -C., Sevkli, M., Gencyilmaz, G. (2007). Particle swarm optimization algorithm for makespan and total flowtime minimization in permutation flowshop sequencing problem. European Journal of Operational Research, 177(3), 1930–47] and [Jarboui, B., Ibrahim, S., Siarry, P., Rebai, A. (2007). A combinatorial particle swarm optimisation for solving permutation flowshop problems. Computers & Industrial Engineering, doi:10.1016/j.cie.2007.09.006]. Ultimately, for Taillard’s benchmark suite, four best known solutions for the makespan criterion as well as 40 out of the 90 best known solutions for the total flowtime criterion are further improved by either one of the algorithms presented in this paper.  相似文献   

19.
This paper investigates the hybrid flowshop scheduling with finite intermediate buffers, whose objective is to minimize the sum of weighted completion time of all jobs. Since this problem is very complex and has been proven strongly NP-hard, a tabu search heuristic is proposed. In this heuristic there are two main features. One is that a scatter search mechanism is incorporated to improve the diversity of the search procedure. And the other is that a permutation of N jobs representing their processing order in the first stage instead of a complex complete schedule is used to denote a solution. Computational experiments on randomly generated instances with different structures show that the proposed tabu search heuristic can provide good solutions compared to both the lower bounds and the algorithm proposed for this problem in a lately published literature.  相似文献   

20.
王凌  郑洁  王晶晶 《控制与决策》2020,35(4):930-936
分布式调度是制造系统领域的前沿研究,而不确定调度问题的研究更具现实意义.针对不确定分布式置换流水线调度问题,采用区间数表示工序加工时间,以最小化区间最大完工时间为目标,利用问题特性在果蝇优化框架内提出一种混合离散果蝇优化算法.首先,通过改进启发式方法和随机方法混合初始化种群;然后,基于概率协同多搜索操作执行嗅觉搜索.为了平衡算法的全局探索与局部开发能力,设计基于学习机制的双种群协同搜索环节.为了进一步提升种群性能,针对优良解设计基于切换机制的双模式局部搜索.基于大量算例的仿真结果与统计对比,表明所提出算法能更有效求解区间数分布式流水线调度问题.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号