首页 | 官方网站   微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 812 毫秒
1.
《Applied Energy》2005,81(2):127-151
Optimizing the gas-turbine combined-cycle is an important method for improving its efficiency. In this paper, a dual-pressure reheat combined-cycle was modeled and optimized for 80 cases. Constraints were set on the minimum temperature-difference for pinch points (PPm), superheat approach temperature-difference, steam-turbine inlet temperature and pressure, stack temperature, and dryness fraction at the steam-turbine’s outlet. The dual-pressure reheat combined-cycle was optimized using two different methods; the direct search and the variable metric. A technique to reduce the irreversibility of the steam generator of the combined cycle was introduced. The optimized and the reduced-irreversibility dual-pressure reheat combined-cycles were compared with the regularly-designed dual-pressure reheat combined-cycle, which is the typical design for a commercial combined-cycle. The effects of varying the inlet temperature of the gas turbine (TIT) and PPm on the performance of all cycles were presented and discussed. The results indicated that the optimized combined-cycle is up to 1% higher in efficiency than the reduced-irreversibility combined-cycle, which is 2–2.5% higher in efficiency than the regularly-designed combined-cycle when compared for the same values of TIT and PPm. The advantages of the optimized and reduced-irreversibility combined-cycles were manifested when compared with the most efficient commercially-available combined cycle at the same value of TIT.  相似文献   

2.
A.M. Bassily   《Applied Energy》2008,85(12):1141-1162
The main methods for improving the efficiency or power of the combined cycle are: increasing the inlet temperature of the gas turbine (TIT), inlet air-cooling, applying gas reheat, steam or water injection into the gas turbine (GT), and reducing the irreversibility of the heat recovery steam generator (HRSG). In this paper, gas reheat with recuperation was applied to the regular triple-pressure steam-reheat combined cycle (the Regular cycle) by replacing the GT unit with a recuperated gas-reheat GT unit (requires two gas turbines, gas recuperator, and two combustion chambers). The Regular cycle with gas-reheat and gas-recuperation (the Regular Gas Reheat cycle) was modeled including detailed modeling of the combustion and GT cooling processes and a feasible technique to reduce the irreversibility of its HRSG was introduced. The Regular Gas Reheat cycle and the Regular Gas Reheat cycle with reduced-irreversibility HRSG (the Reduced Irreversibility cycle) were compared with the Regular cycle, which is the typical design for a commercial combined cycle. The effects of varying the TIT on the performances of all cycles were presented and discussed. The results indicate that the Reduced Irreversibility cycle is 1.9–2.15 percentage points higher in efficiency and 3.5% higher in the total specific work than the Regular Gas Reheat cycle, which is 3.3–3.6 percentage points higher in efficiency and 22–26% higher in the total specific work than the Regular cycle. The Regular Gas Reheat and Reduced Irreversibility cycles are 1.18 and 3.16 percentage points; respectively, higher in efficiency than the most efficient commercially-available combined cycle at the same value of TIT. Economic analysis was performed and showed that applying gas reheat with recuperation to the Regular cycle could result in an annual saving of 10.2 to 11.2 million US dollars for a 339 MW to 348 MW generating unit using the Regular cycle and that reducing the irreversibility of the HRSG of the Regular Gas Reheat cycle could result in an additional annual saving of 11.8 million US dollars for a 439 MW generating unit using the Regular Gas Reheat cycle.  相似文献   

3.
Increasing the inlet temperature of gas turbine (TIT) and optimization are important methods for improving the efficiency and power of the combined cycle. In this paper, the triple‐pressure steam‐reheat gas‐reheat recuperated combined cycle (the Regular Gas‐Reheat cycle) was optimized relative to its operating parameters, including the temperature differences for pinch points (δTPP). The optimized triple‐pressure steam‐reheat gas‐reheat recuperated combined cycle (the Optimized cycle) had much lower δTPP than that for the Regular Gas‐Reheat cycle so that the area of heat transfer of the heat recovery steam generator (HRSG) of the Optimized cycle had to be increased to keep the same rate of heat transfer. For the same mass flow rate of air, the Optimized cycle generates more power and consumes more fuel than the Regular Gas‐Reheat cycle. An objective function of the net additional revenue (the saving of the optimization process) was defined in terms of the revenue of the additional generated power and the costs of replacing the HRSG and the additional fuel. Constraints were set on many operating parameters such as the minimum temperature difference for pinch points (δTPPm), the steam turbines inlet temperatures and pressures, and the dryness fraction at steam turbine outlet. The net additional revenue was optimized at 11 different maximum values of TIT using two different methods: the direct search and variable metric. The performance of the Optimized cycle was compared with that for the Regular Gas‐Reheat cycle and the triple‐pressure steam‐reheat gas‐reheat recuperated reduced‐irreversibility combined cycle (the Reduced‐Irreversibility cycle). The results indicate that the Optimized cycle is 0.17–0.35 percentage point higher in efficiency and 5.3–6.8% higher in specific work than the Reduced‐Irreversibility cycle, which is 2.84–2.91 percentage points higher in efficiency and 4.7% higher in specific work than the Regular Gas‐Reheat cycle when all cycles are compared at the same values of TIT and δTPPm. Optimizing the net additional revenue could result in an annual saving of 33.7 million US dollars for a 481 MW power plant. The Optimized cycle was 3.62 percentage points higher in efficiency than the most efficient commercially available H‐system combined cycle when compared at the same value of TIT. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

4.
Optimization is an important method for improving the efficiency and power of the combined cycle. In this paper, the triple‐pressure steam‐reheat gas‐reheat gas‐recuperated combined cycle that uses steam for cooling the first gas turbine (the regular steam‐cooled cycle) was optimized relative to its operating parameters. The optimized cycle generates more power and consumes more fuel than the regular steam‐cooled cycle. An objective function of the net additional revenue (the saving of the optimization process) was defined in terms of the revenue of the additional generated power and the costs of replacing the heat recovery steam generator (HRSG) and the costs of the additional operation and maintenance, installation, and fuel. Constraints were set on many operating parameters such as air compression ratio, the minimum temperature difference for pinch points (δTppm), the dryness fraction at steam turbine outlet, and stack temperature. The net additional revenue and cycle efficiency were optimized at 11 different maximum values of turbine inlet temperature (TIT) using two different methods: the direct search and the variable metric. The optima were found at the boundaries of many constraints such as the maximum values of air compression ratio, turbine outlet temperature (TOT), and the minimum value of stack temperature. The performance of the optimized cycles was compared with that for the regular steam‐cooled cycle. The results indicate that the optimized cycles are 1.7–1.8 percentage points higher in efficiency and 4.4–7.1% higher in total specific work than the regular steam‐cooled cycle when all cycles are compared at the same values of TIT and δTppm. Optimizing the net additional revenue could result in an annual saving of 21 million U.S. dollars for a 439 MW power plant. Increasing the maximum TOT to 1000°C and replacing the stainless steel recuperator heat exchanger of the optimized cycle with a super‐alloys‐recuperated heat exchanger could result in an additional efficiency increase of 1.1 percentage point and a specific work increase of 4.8–7.1%. The optimized cycles were about 3.3 percentage points higher in efficiency than the most efficient commercially available H‐system combined cycle when compared at the same value of TIT. Copyright © 2008 John Wiley & Sons, Ltd.  相似文献   

5.
天然气联合循环机组因启停快、运行灵活性好、热效率高、排放清洁、建造周期短而倍受中国市场青睐.围绕如何通过燃气轮机进气系统、主机参数匹配、汽轮机冷端等参数优化来提高联合循环热效率是国内外学者研究的热点.以配有目前市场上最高性能等级燃气轮机的联合循环为研究对象,建立了以提高联合循环热效率为目标的热力计算和分析模型,提出了各段蒸汽压力及温度参数优化匹配方法,并进一步分析、讨论了燃料预热对联合循环热效率的影响.在综合考虑余热锅炉换热温差、汽轮机结构设计等制约因素下得到了一组蒸汽循环的优化参数配置.计算结果表明,相比直接沿用上一代蒸汽循环参数,使用该优化参数配置可大幅度提高联合循环效率,并且使用燃料预热可使循环性能得到进一步改善.  相似文献   

6.
9FA型燃气轮机联合循环性能研究   总被引:1,自引:1,他引:1  
1引言西气东输工程促进了沿线燃气轮机联合循环电厂的建设,减轻了中东部地区的环境排放压力。燃气轮机联合循环发电系统高效低污染、启停迅速、调峰能力强。西气东输管道沿线有25台F级燃气轮机联合循环机组,其中GE公司9FA型燃气轮机联合循环发电机组13台。如何保证系统的稳定安  相似文献   

7.
This paper has proposed an improved liquefied natural gas (LNG) fuelled combined cycle power plant with a waste heat recovery and utilization system. The proposed combined cycle, which provides power outputs and thermal energy, consists of the gas/steam combined cycle, the subsystem utilizing the latent heat of spent steam from the steam turbine to vaporize LNG, the subsystem that recovers both the sensible heat and the latent heat of water vapour in the exhaust gas from the heat recovery steam generator (HRSG) by installing a condensing heat exchanger, and the HRSG waste heat utilization subsystem. The conventional combined cycle and the proposed combined cycle are modelled, considering mass, energy and exergy balances for every component and both energy and exergy analyses are conducted. Parametric analyses are performed for the proposed combined cycle to evaluate the effects of several factors, such as the gas turbine inlet temperature (TIT), the condenser pressure, the pinch point temperature difference of the condensing heat exchanger and the fuel gas heating temperature on the performance of the proposed combined cycle through simulation calculations. The results show that the net electrical efficiency and the exergy efficiency of the proposed combined cycle can be increased by 1.6 and 2.84% than those of the conventional combined cycle, respectively. The heat recovery per kg of flue gas is equal to 86.27 kJ s?1. One MW of electric power for operating sea water pumps can be saved. The net electrical efficiency and the heat recovery ratio increase as the condenser pressure decreases. The higher heat recovery from the HRSG exit flue gas is achieved at higher gas TIT and at lower pinch point temperature of the condensing heat exchanger. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

8.
研究了如何提高余热锅炉型三压再热联合循环系统的效率,应用分析的方法建立了系统效率数学模型,以联合循环系统效率最高作为系统性能的评判标准。在亚临界范围内,对余热锅炉的蒸汽参数进行了优化;针对余热锅炉进气温度对余热锅炉性能的影响进行分析,在此基础上提出燃气轮机排气部分回热利用,并研究了回热利用对联合循环效率的影响。计算结果表明:经余热锅炉优化和排气部分回热利用,在基本负荷下,PG9351FA机组的联合循环热效率可提高1.33%;在75%和50%的负荷下,效率分别提高2.11%和4.17%;而具有再热的GT26机组热效率高达60.73%。  相似文献   

9.
在考虑实际影响因素的前提下,推导出燃气轮机热效率关于耦合参数的关系式。以三压有再热余热锅炉的燃气-蒸汽联合循环为例,推导出非补式余热锅炉型蒸汽轮机热效率关于耦合参数的关系式,在此基础上得到了燃气-蒸汽联合循环热效率关于耦合参数的关系式。为研究燃气-蒸汽关于耦合参数的优化研究提供理论依据。  相似文献   

10.
Many F class gas turbine combined cycle(GTCC)power plants are built in China at present because of less emis-sion and high efficiency.It is of great interest to investigate the efficiency improvement of GTCC plant.A com-bined cycle with three-pressure reheat heat recovery steam generator(HRSG)is selected for study in this paper.In order to maximize the GTCC efficiency,the optimization of the HRSG operating parameters is performed.Theoperating parameters are determined by means of a thermodynamic analysis,i.e.the minimization of exergylosses.The influence of HRSG inlet gas temperature on the steam bottoming cycle efficiency is discussed.Theresult shows that increasing the HRSG inlet temperature has less improvement to steam cycle efficiency when itis over 590℃.Partial gas to gas recuperation in the topping cycle is studied.Joining HRSG optimization with theuse of gas to gas heat recuperation,the combined plant efficiency can rise up to 59.05% at base load.In addition,the part load performance of the GTCC power plant gets much better.The efficiency is increased by 2.11% at75% load and by 4.17% at 50% load.  相似文献   

11.
The paper deals with thermodynamic analysis of cooled gas turbine‐based gas‐steam combined cycle with single, dual, or triple pressure bottoming cycle configuration. The cooled gas turbine analyzed here uses air as blade coolant. Component‐wise non‐dimensionalized exergy destruction of the bottoming cycle has been quantified with the objective to identify the major sources of exergy destruction. The mass of steam generated in different configurations of heat recovery steam generator (HRSG) depends upon the number of steam pressure drums, desired pressure level, and steam temperature. For the selected set of operating parameters, maximum steam has been observed to be generated in the case of triple pressure HRSG = 19 kg/kg and minimum in single pressure HRSG = 17.25 kg/kg. Plant‐efficiency and plant‐specific works are both highest for triple‐pressure bottoming cycle combined cycle. Non‐dimensionalized exergy destruction in HRSG is least at 0.9% for B3P, whereas 1.23% for B2P, and highest at 3.2% for B1P illustrating that process irreversibility is least in the case of B3P and highest in B1P. Copyright © 2012 John Wiley & Sons, Ltd.  相似文献   

12.
The integration of an aqua‐ammonia inlet air‐cooling scheme to a cooled gas turbine‐based combined cycle has been analyzed. The heat energy of the exhaust gas prior to the exit of the heat recovery steam generator has been chosen to power the inlet air‐cooling system. Dual pressure reheat heat recovery steam generator is chosen as the combined cycle configuration. Air film cooling has been adopted as the cooling technique for gas turbine blades. A parametric study of the effect of compressor–pressure ratio, compressor inlet temperature, turbine inlet temperature, ambient relative humidity, and ambient temperature on performance parameters of plants has been carried out. It has been observed that vapor absorption inlet air cooling improves the efficiency of gas turbine by upto 7.48% and specific work by more than 18%, respectively. However, on the adoption of this scheme for combined cycles, the plant efficiency has been observed to be adversely affected, although the addition of absorption inlet air cooling results in an increase in plant output by more than 7%. The optimum value of compressor inlet temperature for maximum specific work output has been observed to be 25 °C for the chosen set of conditions. Further reduction of compressor inlet temperature below this optimum value has been observed to adversely affect plant efficiency. Copyright © 2013 John Wiley & Sons, Ltd.  相似文献   

13.
《Applied Thermal Engineering》2002,22(13):1501-1518
The paper proposes an analysis of some possibilities to increase the combined cycle plant efficiency to values higher than the 60% without resorting to a new gas turbine technology. Optimization of heat recovery steam generator (HRSG) with the use of parallel sections and of limit subcritical conditions (up to 220 bar) is the key elements to obtain this result.The HRSG optimization is sufficient to obtain combined cycle plant efficiencies of the order of 60% while, joining HRSG optimization with the use of gas turbine reheat (postcombustion) and gas to gas recuperation can lead the efficiency of the whole plant to the limit value of 65%. Results are proposed with reference to a turbine inlet temperature of 1500 K, corresponding to those of usual commercial D–F series gas turbine.  相似文献   

14.
The objective of this research is to model steam injection in the gas turbine with Air Bottoming Cycle (ABC). Based on an exergy analysis, a computer program has been developed to investigate improving the performance of an ABC cycle by calculating the irreversibility in the corresponding devices of the system. In this study, we suggest two new cycles where an air bottoming cycle along with the steam injection are used. These cycles are: the Evaporating Gas turbine with Air Bottoming Cycle (EGT-ABC), and Steam Injection Gas turbine with Air Bottoming Cycle (STIG-ABC). The results of the model show that in these cycles, more energy recovery and higher air inlet mass flow rate translate into an increase of the efficiency and output turbine work. The EGT-ABC was found to have a lower irreversibility and higher output work when compared to the STIG-ABC. This is due to the fact that more heat recovery in the regenerator in the EGT-ABC cycle results in a lower exhaust temperature. The extensive modeling performed in this study reveals that, at the same up-cycle pressure ratio and turbine inlet temperature (TIT), a higher overall efficiency can be achieved for the EGT-ABC cycle.  相似文献   

15.
Combined cycle configuration has the ability to use the waste heat from the gas turbine exhaust gas using the heat recovery steam generator for the bottoming steam cycle. In the current study, a natural gas‐fired combined cycle with indirectly fired heating for additional work output is investigated for configurations with and without reheat combustor (RHC) in the gas turbine. The mass flow rate of coal for the indirect‐firing mode in circulating fluidized bed (CFB) combustor is estimated based on fixed natural gas input for the gas turbine combustion chamber (GTCC). The effects of pressure ratio, gas turbine inlet temperature, inlet temperatures to the air compressor and to the GTCC on the overall cycle performance of the combined cycle configuration are analysed. The combined cycle efficiency increases with pressure ratio up to the optimum value. Both efficiency and net work output for the combined cycle increase with gas turbine inlet temperature. The efficiency decreases with increase in the air compressor inlet temperature. The indirect firing of coal shows reduced use with increase in the turbine inlet temperature due to increase in the use of natural gas. There is little variation in the efficiency with increase in GTCC inlet temperature resulting in increased use of coal. The combined cycle having the two‐stage gas turbine with RHC has significantly higher efficiency and net work output compared with the cycle without RHC. The exergetic efficiency also increases with increase in the gas turbine inlet temperature. The exergy destruction is highest for the CFB combustor followed by the GTCC. The analyses show that the indirectly fired mode of the combined cycle offers better performance and opportunities for additional net work output by using solid fuels (coal in this case). Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

16.
Combined cycle power plants (CCPPs) have an important role in power generation. The objective of this paper is to evaluate irreversibility of each part of Neka CCPP using the exergy analysis. The results show that the combustion chamber, gas turbine, duct burner and heat recovery steam generator (HRSG) are the main sources of irreversibility representing more than 83% of the overall exergy losses. The results show that the greatest exergy loss in the gas turbine occurs in the combustion chamber due to its high irreversibility. As the second major exergy loss is in HRSG, the optimization of HRSG has an important role in reducing the exergy loss of total combined cycle. In this case, LP‐SH has the worst heat transfer process. The first law efficiency and the exergy efficiency of CCPP are calculated. Thermal and exergy efficiencies of Neka CCPP are 47 and 45.5% without duct burner, respectively. The results show that if the duct burner is added to HRSG, these efficiencies are reduced to 46 and 44%. Nevertheless, the results show that the CCPP output power increases by 7.38% when the duct burner is used. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

17.
以9FA燃气轮机配套的余热锅炉为例,介绍了F级余热锅炉特点及蒸汽减温配置,主蒸汽温度、二级高压过热器出口温度及再热蒸汽温度的控制策略,过热度保护和最小流量保护的实现方法。机组启动阶段,IGV参与燃气轮机排气温度控制,此时采用IGV角度前馈来稳定启动期间的主蒸汽温度。  相似文献   

18.
Pouria Ahmadi  Ibrahim Dincer   《Energy》2010,35(12):5161-5172
In the present work, a combined heat and power plant for cogeneration purposes that produces 50 MW of electricity and 33.3 kg/s of saturated steam at 13 bar is optimized using genetic algorithm. The design parameters of the plant considered are compressor pressure ratio (rAC), compressor isentropic efficiency (ηcomp), gas turbine isentropic efficiency (ηGT), combustion chamber inlet temperature (T3), and turbine inlet temperature (TIT). In addition, to optimally find the optimum design parameters, an exergoeconomic approach is employed. A new objective function, representing total cost rate of the system product including cost rate of each equipment (sum of the operating cost, related to the fuel consumption) and cost rate of environmental impact (NOx and CO) is considered. Finally, the optimal values of decision variables are obtained by minimizing the objective function using evolutionary genetic algorithm. Moreover, the influence of changes in the demanded power on various design parameters are parametrically studied for 50, 60, 70 MW of net power output. The results show that for a specific unit cost of fuel, the values of design parameters increase, as the required, with net power output increases. Also, the variations of the optimal decision variables versus unit cost of fuel reveal that by increasing the fuel cost, the pressure ratio, rAC, compressor isentropic efficiency, ηAC, turbine isentropic efficiency, ηGT, and turbine inlet temperature (TIT) increase.  相似文献   

19.
This study provides a computational analysis to investigate the effects of cycle pressure ratio, turbine inlet temperature (TIT), and ambient relative humidity (φ) on the thermodynamic performance of an indirect intercooled reheat regenerative gas turbine cycle with indirect evaporative cooling of the inlet air and evaporative aftercooling of the compressor discharge. Combined first and second‐law analysis indicates that the exergy destruction in various components of gas turbine cycles is significantly affected by compressor pressure ratio and turbine inlet temperature, and is not at all affected by ambient relative humidity. It also indicates that the maximum exergy is destroyed in the combustion chamber; which represents over 60% of the total exergy destruction in the overall system. The net work output, first‐law efficiency, and the second‐law efficiency of the cycle significantly varies with the change in the pressure ratio, turbine inlet temperature and ambient relative humidity. Results clearly shows that performance evaluation based on first‐law analysis alone is not adequate, and hence more meaningful evaluation must include second‐law analysis. Decision makers should find the methodology contained in this paper useful in the comparison and selection of gas turbine systems. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

20.
Sanjay 《Energy》2011,36(1):157-167
The paper deals with second law thermodynamic analysis of a basic gas turbine based gas-steam combined cycle. The article investigates the effect of variation of cycle parameters on rational efficiency and component-wise non-dimensionalised exergy destruction of the plant. Component-wise inefficiencies of the combined cycle have been quantified with the objective to pin-point the major sources of exergy destruction. The parameter that affects cycle performance most is the TIT (turbine inlet temperature). TIT should be kept on the higher side, because at lower values, the exergy destruction is higher. The summation of total exergy destruction of all components in percentage terms is lower (44.88%) at TIT of 1800 K & rp,c = 23, as compared to that at TIT = 1700 K. The sum total of rational efficiency of gas turbine and steam turbine is found to be higher (54.91%) at TIT = 1800 K & rp,c = 23, as compared to that at TIT = 1700 K. Compressor pressure ratio also affects the exergy performance. The sum total of exergy destruction of all components of the combined cycle plant is lower (44.17%) at higher value of compressor pressure ratio (23)& TIT = 1700 K, as compared to that at compressor pressure ratio (16). Also exergy destruction is minimized with the adoption of multi-pressure-reheat steam generator configuration.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号