共查询到20条相似文献,搜索用时 388 毫秒
1.
A. M. Freidin A. P. Tapsiev V. A. Uskov L. A. Nazarova A. A. Zaporozhtsev M. P. Sergunin 《Journal of Mining Science》2007,43(3):290-299
The mining conditions in Yuzhny district of Zapolyarny Mine are reported. The alternative mining technologies for the additionally
explored mine field are considered. The results of modeling and evaluation of stress-strain state in rocks under mining by
the discussed mining technologies are cited.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 3, pp. 84–94, May–June, 2007. 相似文献
2.
P. A. Filippov 《Journal of Mining Science》2008,44(5):512-517
The author analyzes industrial injuries and diseases in terms of iron-ore mining enterprises in Siberia. It is shown that
the harm to health is conditioned by the technology chosen for underground mining. To improve the safety of mining operations,
it is recommended to select the sublevel caving method with areal-frontal ore drawing and mobile mining machinery for thick
steep deposits.
__________
Translated from Fiziko-Tekhnicheskie ProblemyRazrabotki Poleznykh Iskopaemykh, No. 5, pp. 98–104, September–October, 2008. 相似文献
3.
The authors analyzed various criteria that are used in different classifications of mining methods and systems. It is shown
that today’s complex geomechanical situation of mining at large depths and wide application of mobile machinery to mineral
exploitation has brought to nothing the erstwhile practical importance of many geotechnologies. The modern trend-based classification
of the underground ore mining methods is proposed.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 6, pp. 47–57, November–December, 2008. 相似文献
4.
Soma Giri Gurdeep Singh S. K. Gupta V. N. Jha R. M. Tripathi 《Mine Water and the Environment》2010,29(3):225-234
The East Singhbhum region is a highly mineralised zone, with extensive mining of copper, uranium, and other minerals. The
concentrations of certain metals (Fe, Mn, Zn, Pb, Cu, and Ni) were measured in 10 groundwater locations and eight surface
water locations for four seasons during 1 year around a proposed uranium mining area. The ranges of Fe, Mn, Zn, Pb, Cu, and
Ni in surface water were 0.08–1.21, 0.02–0.32, 0.02–3.48 mg/L, 0.84–14, 1.25–36, and 1.24–15 μg/L, respectively, while in
groundwater, the ranges were 0.06–5.3, 0.01–1.3, 0.02–8.2 mg/L, 1.4–28, 0.78–20, and 1.05–20 μg/L, respectively. Only Fe and
Mn were found to exceed India’s drinking water standards. The data have been used to calculate a metal pollution index (MPI).
The MPI of both groundwater (28) and surface water (10) is well below the index limit of 100, which suggest that neither is
generally contaminated with respect to these metals. 相似文献
5.
V. I. Cheskidov 《Journal of Mining Science》2007,43(4):429-435
The potentialities of the leading mining districts in Russia to improve coal production by strip mining are analyzed. The
operational issues of the Erunakovskiy (Kuzbass), Kansko-Achinskiy and South Yakutia territorial production complexes are
considered.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 4, pp. 98–105, July–August, 2007. 相似文献
6.
Using the former Luxembourg mining basin as a test site, the current research has been carried out to check whether or not
subsurface radon concentrations can be related to mining and mining subsidence voids in order to allow the creation of a subsidence
risk map. The location of enhanced radon concentrations may point to a local increased subsidence risk, consecutive to a fractioning
of the underground.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 5, pp. 120–124, September–October, 2006. 相似文献
7.
A. A. Eremenko V. I. Klishin V. A. Eremenko A. P. Filatov 《Journal of Mining Science》2008,44(3):271-282
The authors offer the optional versions of mining methods and technological schemes for mining at Udachnaya pipe reserves
under the opencast bottom. The rational chamber-and-pillar method has been substantiated, considering the complicated mining-geological
and geomechanical condition at the deposit. The economical feasibility of the proposed underground mining variants has been
evaluated.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 3, pp. 55–67, May–June, 2008. 相似文献
8.
K. Holub 《Journal of Mining Science》2006,42(1):15-26
Geomechanical problems of mining in the Ostrava-Karviná Coal Basin were studied on the basis of long-term experience gained
from seismological observations. They could serve as reasonable models of rock-mass response to temporary reduction and gradual
decline in mining activities and mine closure.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 1, pp. 18–30, January–February, 2006. 相似文献
9.
Slobodan Vujic Borislav Zajic Igor Miljanovic Aleksandar Petrovski 《Journal of Mining Science》2008,44(4):402-406
Application of GPS in mining and geology has proved to be of ever increasing importance since recently. GPS is used for positioning
both researching and exploitation drill holes, mining facilities, equipment, machines, when monitoring slopes and falls, mining
facilities dimensioning, navigation of machines, roads tracing, etc. The paper presents a pilot system for surveillance and
monitoring of energetic and technological parameters at open pit mines, developed at the “Jazovnik” open pit mine for experimental
purposes.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 4, pp. 90–94, July–August, 2008. 相似文献
10.
Based on the numerical modeling results, the authors have revealed the features of stress state in the vicinity of development
and stope workings in the course of the upward slice chamber-and-pillar mining under the open pit bottom in terms of the mine
“Aikhal”. The optimal layout of access entries and their mining sequence in a layer are substantiated.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 2, pp. 47–55, March–April, 2008. 相似文献
11.
S. G. Molotilov V. K. Norri V. I. Cheskidov A. R. Mattis 《Journal of Mining Science》2007,43(1):57-66
A method is proposed for selecting a rational mining sequence with internal dumping for flat stratified deposits, using new
principles of the open-pit process-space formation and development. The main criteria for substantiating the mining sequence
are geometrical form and development direction of the open-pit space, structure of the working wall and transportation network,
internal dumping capacities and mining earthworks volumes.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 1, pp. 64–74, January–February, 2007. 相似文献
12.
Substantiation of the sequence for opencast mining of a series of flat and inclined strata using the mined-out space for internal dumps 总被引:1,自引:0,他引:1
The possibilities of using the mined-out space of opencasts for placing the overburden in internal dumps are studied. It is
established that on completion of mining flat and inclined strata there are free capacities in the mined-out space consisting
of 40–70% of its volume which are a resource for placing the overburden from other opencasts with substantiation of the sequence
of mining large deposits. A complex criterion is suggested that takes account of energy expenditures for mining a deposit
and the energy damage caused to the environment. A procedure is given for solving the problem and results are presented of
calculations for the Taldinsk and the Tomusinsk deposits.
Institute of Mining, Siberian Branch, Russian Academy of Sciences, Novosibirsk. Translated from Fiziko-Tekhnicheskie Problemy
Razrabotki Poleznykh Iskopaemykh, No. 3, pp. 97–106, May–June, 1999. 相似文献
13.
The relationships between the structural weakening coefficient of rocks and the geological, mining and technical factors have
been obtained from the statistical analysis of actual data. The provisions for wider application range of the blast-free technology
in open pit mining are revealed.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 4, pp. 86–89, July–August, 2007. 相似文献
14.
The authors offer new solutions for mineral mining. A key idea is the construction of artificial separating masses at the
stage of preparing a deposit and its part for exploitation. In terms of the underground mines belonging to “Alrosa“ JSC, “GMK
Norilsk Nickel“, it is shown that the implementation of the new approach will prevent mine workings from aggressive water
ingress, secure from other negative factors, and will allow the application of highly productive chamber mining schemes.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 5, pp. 89–97, September–October, 2008. 相似文献
15.
D. R. Kaplunov 《Journal of Mining Science》1999,35(3):286-290
A set of problems is considered for planning underground mining of ore deposits. Achievements are noted in domestic mining
science in the field of improving planning methods and design parameters for underground mines. Principles in the development
of planning theory for mining enterprises at the contemporary level are formulated.
Institute of Problems of Complex Development of Bowels, Russian Academy of Sciences, Moscow. Translated from Fiziko-Tekhnicheskie
Problemy Razrabotki Poleznykh Iskopaemykh, No. 3, pp. 80–84, May–June, 1999. 相似文献
16.
The results are considered for the in situ testing of a new variant of chamber mining with roof caving by the chamber - pillar
scheme under complicated conditions at large depths. It is shown that the increased horizontal stresses in a rock mass promote
improvement of the undermined roof stability and give an opportunity to raise the volumes of chamber mining.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 4, pp. 60–67, July–August, 2005. 相似文献
17.
S. G. Molotilov V. K. Norri V. I. Cheskidov A. R. Mattis 《Journal of Mining Science》2006,42(6):622-627
An analysis is performed into the currently applied coal mining methods using mined-out space in an open pit, with describing
their basic advantages and disadvantages. The urgency of further development and wider application of the gritwise-and-capwise
methods that involve differently directed advance of a mining front and mined-out space utilized to the limit for overburden
storage is pointed out.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 6, pp. 111–118, November–December, 2006. 相似文献
18.
R. Yu. Zamaraev V. N. Oparin S. E. Popov V. P. Potapov O. L. Pyastunovich 《Journal of Mining Science》2008,44(3):302-311
The paper describes the bases of a new application of GIS-technologies for integrated assessment and comparison of the productive
mining areas, involving a wide range of mining and technological factors, considering mineral properties, mineral occurrence
conditions and geographical advantages of a mineral deposit location. The model capabilities are exemplified by a comparison
of technological characteristics of coals, transportation and power supply infrastructure of the productive mining areas at
the Kuznetsk Coal Basin.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 3, pp. 91–101, May–June, 2008. 相似文献
19.
The analytical dependences to describe the shape of a subsidence trough of the earth’s surface under the action of underground
mining of a flat sheet-like deposit are constructed by the numerical modeling data.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 4, pp. 3–24, July–August, 2007. 相似文献
20.
V. N. Oparin I. I. Ainbinder Yu. I. Rodionov P. G. Patskevich A. P. Tapsiev A. M. Freidin B. P. Badtiev V. A. Glukhov 《Journal of Mining Science》2007,43(6):646-654
The paper discusses the studies devoted to evolution of prospective mining technologies for deep thick strata of the Talnakhsky
and Oktyabrsky deposits. The mining-and-technical features of the deposits are considered. A strategic trend is pinpointed
towards technological upgrading with automation and robotization of geotechnological processes. The authors prove practicability
of concurrent mining of massive sulphide and impregnated ores. The generalized models of mining enterprises are examined,
and a concept of a mine of tomorrow is set forth as a system of scientific ideas, principles and priorities.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 6, pp. 89–100, November–December, 2007. 相似文献