共查询到20条相似文献,搜索用时 46 毫秒
1.
V. I. Cheskidov 《Journal of Mining Science》2007,43(4):429-435
The potentialities of the leading mining districts in Russia to improve coal production by strip mining are analyzed. The
operational issues of the Erunakovskiy (Kuzbass), Kansko-Achinskiy and South Yakutia territorial production complexes are
considered.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 4, pp. 98–105, July–August, 2007. 相似文献
2.
P. A. Filippov 《Journal of Mining Science》2008,44(5):512-517
The author analyzes industrial injuries and diseases in terms of iron-ore mining enterprises in Siberia. It is shown that
the harm to health is conditioned by the technology chosen for underground mining. To improve the safety of mining operations,
it is recommended to select the sublevel caving method with areal-frontal ore drawing and mobile mining machinery for thick
steep deposits.
__________
Translated from Fiziko-Tekhnicheskie ProblemyRazrabotki Poleznykh Iskopaemykh, No. 5, pp. 98–104, September–October, 2008. 相似文献
3.
A. M. Freidin A. P. Tapsiev V. A. Uskov L. A. Nazarova A. A. Zaporozhtsev M. P. Sergunin 《Journal of Mining Science》2007,43(3):290-299
The mining conditions in Yuzhny district of Zapolyarny Mine are reported. The alternative mining technologies for the additionally
explored mine field are considered. The results of modeling and evaluation of stress-strain state in rocks under mining by
the discussed mining technologies are cited.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 3, pp. 84–94, May–June, 2007. 相似文献
4.
R. Yu. Zamaraev V. N. Oparin S. E. Popov V. P. Potapov O. L. Pyastunovich 《Journal of Mining Science》2008,44(3):302-311
The paper describes the bases of a new application of GIS-technologies for integrated assessment and comparison of the productive
mining areas, involving a wide range of mining and technological factors, considering mineral properties, mineral occurrence
conditions and geographical advantages of a mineral deposit location. The model capabilities are exemplified by a comparison
of technological characteristics of coals, transportation and power supply infrastructure of the productive mining areas at
the Kuznetsk Coal Basin.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 3, pp. 91–101, May–June, 2008. 相似文献
5.
The authors offer new solutions for mineral mining. A key idea is the construction of artificial separating masses at the
stage of preparing a deposit and its part for exploitation. In terms of the underground mines belonging to “Alrosa“ JSC, “GMK
Norilsk Nickel“, it is shown that the implementation of the new approach will prevent mine workings from aggressive water
ingress, secure from other negative factors, and will allow the application of highly productive chamber mining schemes.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 5, pp. 89–97, September–October, 2008. 相似文献
6.
K. Holub 《Journal of Mining Science》2006,42(1):15-26
Geomechanical problems of mining in the Ostrava-Karviná Coal Basin were studied on the basis of long-term experience gained
from seismological observations. They could serve as reasonable models of rock-mass response to temporary reduction and gradual
decline in mining activities and mine closure.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 1, pp. 18–30, January–February, 2006. 相似文献
7.
The authors analyzed various criteria that are used in different classifications of mining methods and systems. It is shown
that today’s complex geomechanical situation of mining at large depths and wide application of mobile machinery to mineral
exploitation has brought to nothing the erstwhile practical importance of many geotechnologies. The modern trend-based classification
of the underground ore mining methods is proposed.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 6, pp. 47–57, November–December, 2008. 相似文献
8.
S. G. Molotilov V. K. Norri V. I. Cheskidov A. R. Mattis 《Journal of Mining Science》2006,42(6):622-627
An analysis is performed into the currently applied coal mining methods using mined-out space in an open pit, with describing
their basic advantages and disadvantages. The urgency of further development and wider application of the gritwise-and-capwise
methods that involve differently directed advance of a mining front and mined-out space utilized to the limit for overburden
storage is pointed out.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 6, pp. 111–118, November–December, 2006. 相似文献
9.
A. A. Eremenko V. I. Klishin V. A. Eremenko A. P. Filatov 《Journal of Mining Science》2008,44(3):271-282
The authors offer the optional versions of mining methods and technological schemes for mining at Udachnaya pipe reserves
under the opencast bottom. The rational chamber-and-pillar method has been substantiated, considering the complicated mining-geological
and geomechanical condition at the deposit. The economical feasibility of the proposed underground mining variants has been
evaluated.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 3, pp. 55–67, May–June, 2008. 相似文献
10.
S. G. Molotilov V. K. Norri V. I. Cheskidov A. R. Mattis 《Journal of Mining Science》2007,43(1):57-66
A method is proposed for selecting a rational mining sequence with internal dumping for flat stratified deposits, using new
principles of the open-pit process-space formation and development. The main criteria for substantiating the mining sequence
are geometrical form and development direction of the open-pit space, structure of the working wall and transportation network,
internal dumping capacities and mining earthworks volumes.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 1, pp. 64–74, January–February, 2007. 相似文献
11.
Using the former Luxembourg mining basin as a test site, the current research has been carried out to check whether or not
subsurface radon concentrations can be related to mining and mining subsidence voids in order to allow the creation of a subsidence
risk map. The location of enhanced radon concentrations may point to a local increased subsidence risk, consecutive to a fractioning
of the underground.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 5, pp. 120–124, September–October, 2006. 相似文献
12.
The authors propose a number of modified versions of well-known multicriterion optimization methods and discuss their application
to select an optimal underground chromite mining technique.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No.4, pp. 78–89, July–August, 2008. 相似文献
13.
Substantiation of the sequence for opencast mining of a series of flat and inclined strata using the mined-out space for internal dumps 总被引:1,自引:0,他引:1
The possibilities of using the mined-out space of opencasts for placing the overburden in internal dumps are studied. It is
established that on completion of mining flat and inclined strata there are free capacities in the mined-out space consisting
of 40–70% of its volume which are a resource for placing the overburden from other opencasts with substantiation of the sequence
of mining large deposits. A complex criterion is suggested that takes account of energy expenditures for mining a deposit
and the energy damage caused to the environment. A procedure is given for solving the problem and results are presented of
calculations for the Taldinsk and the Tomusinsk deposits.
Institute of Mining, Siberian Branch, Russian Academy of Sciences, Novosibirsk. Translated from Fiziko-Tekhnicheskie Problemy
Razrabotki Poleznykh Iskopaemykh, No. 3, pp. 97–106, May–June, 1999. 相似文献
14.
Based on the numerical modeling results, the authors have revealed the features of stress state in the vicinity of development
and stope workings in the course of the upward slice chamber-and-pillar mining under the open pit bottom in terms of the mine
“Aikhal”. The optimal layout of access entries and their mining sequence in a layer are substantiated.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 2, pp. 47–55, March–April, 2008. 相似文献
15.
D. R. Kaplunov 《Journal of Mining Science》1999,35(3):286-290
A set of problems is considered for planning underground mining of ore deposits. Achievements are noted in domestic mining
science in the field of improving planning methods and design parameters for underground mines. Principles in the development
of planning theory for mining enterprises at the contemporary level are formulated.
Institute of Problems of Complex Development of Bowels, Russian Academy of Sciences, Moscow. Translated from Fiziko-Tekhnicheskie
Problemy Razrabotki Poleznykh Iskopaemykh, No. 3, pp. 80–84, May–June, 1999. 相似文献
16.
V. N. Oparin I. I. Ainbinder Yu. I. Rodionov P. G. Patskevich A. P. Tapsiev A. M. Freidin B. P. Badtiev V. A. Glukhov 《Journal of Mining Science》2007,43(6):646-654
The paper discusses the studies devoted to evolution of prospective mining technologies for deep thick strata of the Talnakhsky
and Oktyabrsky deposits. The mining-and-technical features of the deposits are considered. A strategic trend is pinpointed
towards technological upgrading with automation and robotization of geotechnological processes. The authors prove practicability
of concurrent mining of massive sulphide and impregnated ores. The generalized models of mining enterprises are examined,
and a concept of a mine of tomorrow is set forth as a system of scientific ideas, principles and priorities.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 6, pp. 89–100, November–December, 2007. 相似文献
17.
Conclusions
Institute of Mining, Siberian Branch, Russian Academy of Sciences. Translated from Fizkiko-Tekhnicheskie Problemy Razrabotky
Poleznykh Iskopaemykh, No. 6, pp. 85–92, November–December, 1998. 相似文献
1. | The use of excavator-power-shovels with a scoop of active operation for mining coal-saturated regions makes it possible to simplify the technology and eliminate the losses and impoverishment caused by drilling and blasting operations. |
2. | A method of computation based on modelling of the trajectory of the excavator scoop can reliably evaluate indices characterizing coal loss and impoverishment in the selective and selective-gross mining of seams by excavators with a scoop of active operation. |
3. | The selective mining of coal seams with excavators equipped with a scoop of active operation is effective when the seams are excavated in sub-benches and the dip angle of the hanging wall is within the range α=45–65° (EKG-5V0 and α+48–78° (EKG-12V). Such excavation is effective in selective-gross mining when α>50° (EKG-5V, EKG-12V). |
18.
L. A. Nazarov L. A. Nazarova A. M. Freidin Zh. K. Alimseitova 《Journal of Mining Science》2006,42(6):530-539
It is shown for the room-and-pillar mining of ore deposits of alternating thickness that service-life of pillars is much dependent
on the value of horizontal stresses in the intact massif. A method is proposed and an effective algorithm is developed for
determining the rheological parameters of rocks on the basis of the inverse problem solution by the data on covergence of
the roof and floor in mines.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 6, pp. 11–21, November–December, 2006. 相似文献
19.
The large and deeply exploitated quarry district of the Pietra Serena at Fiesole (Florence, Italy) was worked out through,
centuries with no design or any preliminary investigation. In this paper, we characterize the Macigno stratigraphic succession
outcropping in the Fiesole hills in terms of geostructural setting and geomechanical properties. We performed stability analysis
to verify the safety of slopes of open pits and underground openings, as well as retrospective review of the methods to provide
safe environment for Pietra Serena mining.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Polezuykh Iskopaemykh, No. 1, pp. 84–94, January–February, 2006. 相似文献
20.
Using the mathematical modeling approach, the rock mass stress state is analyzed in the case of the open pit and underground
mining of ore reserves of the “Udachnaya” pipe, the stability of the open pit walls and possible failure of the host rocks
in the area of second working are estimated.
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 4, pp. 25–35, July–August, 2007. 相似文献