首页 | 官方网站   微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   4篇
  免费   0篇
交通运输   4篇
  2013年   1篇
  2009年   2篇
  2000年   1篇
排序方式: 共有4条查询结果,搜索用时 0 毫秒
1
1.
2.
Correction of the O–D matrix from traffic counts is a classical procedure usually adopted in transport engineering by practitioners for improving the overall reliability of transport models. Recently, Papola and Marzano [Papola, A., Marzano, V., 2006. How can we trust in the O–D matrix correction procedure using traffic counts? In: Proceedings of the 2006 ETC Conference, Strasbourg] showed through laboratory experiments that this procedure is generally unable to provide for effective correction of the O–D matrix. From a theoretical standpoint, this result can be justified by the lower number of (stochastic) equations (independent observed link flows) with respect to the unknowns (O–D flows). This paper first confirms that this represents the main reason for the failure of this procedure, showing that satisfactory correction is generally obtained when the number of equations is greater than the number of unknowns. Then, since this circumstance does not occur in practice, where the number of O–D pairs usually far exceeds the number of link counts, we explore alternative assumptions and contexts, allowing for a proper balance between unknowns and equations. This can be achieved by moving to within-day dynamic contexts, where a much larger number of equations are generally available. In order to bound the corresponding increase in the number of unknowns, specific reasonable hypotheses on O–D flow variation across time slices must be introduced. In this respect, we analyze the effectiveness of the O–D matrix correction procedure in the usually adopted linear hypothesis on the dynamic process evolution of O–D flows and under the assumption of constant distribution shares. In the second case it is shown that satisfactory corrections can be performed using a small number of time slices of up to 3 min in length, leading to a time horizon in which the hypothesis of constant distribution shares can be regarded as trustworthy and realistic.  相似文献   
3.
由于相关国际组织长期不懈的努力,隧道工程,特别是城市地区隧道工程的风险管理正成为一种惯例.对于机械化隧道工程情况也是如此,即使常常被认为是一种安全、快速的隧道施工方法,但仍然有许多其它因素决定着这种先进的施工技术的成败.为有助于控制所有重要因素,就需要制定和实施风险管理计划(RMP).文章介绍了风险管理计划的必要元素,并阐述了隧道掘进计划(PAT)方法,以确保城市地区机械化隧道工程获得成功.  相似文献   
4.
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号