基于多目标0-1规划的采掘作业计划优化
引用本文:李瑞,胡乃联,李国清,李威,赵威.基于多目标0-1规划的采掘作业计划优化[J].金属矿山,2017(2).
作者姓名:李瑞  胡乃联  李国清  李威  赵威
作者单位:1. 北京科技大学土木与资源工程学院,北京,100083;2. 山东黄金集团有限公司三山岛金矿,山东 莱州,261442
摘    要:为了满足矿山精细化管理的要求,实现生产的安全性和高效性目标,针对地下金属矿山传统计划编制时存在主观性强、实时性差、效率低、误差大以及难以求得全局最优解的弊端,以采掘车间月出矿量、月出矿平均品位、月生产利润为目标,以采场地质条件、车间生产能力、生产任务以及生产原则为约束,构建基于多目标0-1规划的采掘车间作业计划优化模型。模型采用理想点法对目标函数进行降维,决策变量为二维0-1变量,从空间和时间2个维度描述了采掘车间的生产决策状态,简化了模型的求解过程,在LINGO求解器中编写模型语言进行求解,进而得到计划周期内的最优排产方案。以某地下黄金矿山车间作业计划编制为应用案例,解算出某月采场开采的最优时序方案,并用甘特图进行直观展示。结果表明:该模型适用于地下金属矿山采掘作业计划编制,克服了手工编制方法的弊端,保证了采掘车间生产指标的动态平衡,有利于提高矿山的经济效益。

关 键 词:黄金矿山  采掘车间  作业计划  多目标0-1规划  动态优化

Optimization of Mining Operation Plan Based on Multi-objective 0-1 Programming
Li Rui,Hu Nailian,Li Guoqing,Li Wei,Zhao Wei.Optimization of Mining Operation Plan Based on Multi-objective 0-1 Programming[J].Metal Mine,2017(2).
Authors:Li Rui  Hu Nailian  Li Guoqing  Li Wei  Zhao Wei
Abstract:In order to meet the requirements of refined mining management and realize the safety and high efficiency of mine production,the tradition planning of underground metal mine has some disadvantages such as strong subjectivity,poor re-al-time performance,low efficiency,big error and difficult to obtain the global optimal solution. The mining workshop operation plan is converted into the multi-objective 0-1 programming model constrained by the mining conditions,workshop production capacity,production tasks as well as production principles,which aims to maximum monthly mining amount,average ore grade and production profits. The ideal point method is used to reduce the dimension of the objective function,the production deci-sion-making state of the mining workshop is described from two dimensions:space and time by two-dimensional 0-1 decision variables,so the solution process of the model is simplified. The model is solved by programming in LINGO,and then the opti-mal scheduling plane in the planning cycle is obtained. The optimization model established in this paper is applied in an under-ground gold mine to optimize the mining operation plan,the optimal timing scheme of stope mining of a certain mouth is ob-tained,and is is displayed by using the Gantt chart. The study results show that the optimization model established in this paper is suitable for the mining operation plan scheduling of underground metal mine,and is good for overcome the drawbacks of the manual scheduling method,besides that,it also help for improving the economic benefits of the mine.
Keywords:Gold mine  Mining workshop  Operation plan  Multi-objective 0-1 programming  Dynamic optimization