漫湾水电站二期工程引水系统设计概述
引用本文:赵学昌.漫湾水电站二期工程引水系统设计概述[J].广西水利水电,2012(3):21-24.
作者姓名:赵学昌
作者单位:广西水利电力勘测设计研究院,广西 南宁 530023
摘    要:漫湾水电站二期工程位于枢纽右岸,以发电为单一开发目标,装机容量为1×300 MW.引水系统建筑物由进水口、引水隧洞、压力钢管道等组成.主要介绍了引水系统的布置及水力计算和结构设计.

关 键 词:漫湾水电站  二期工程  引水系统  设计

Water diversion system design of Manwan Hydropower Station 2nd-stage Project
ZHAO Xue-chang.Water diversion system design of Manwan Hydropower Station 2nd-stage Project[J].Gx Water Resources & Hydropower Engineering,2012(3):21-24.
Authors:ZHAO Xue-chang
Affiliation:ZHAO Xue-chang(Guangxi Water and Power Design Institute,Nanning 530023,China)
Abstract:With installed capacity of 1 × 300MW and power generation as the only development purpose,the 2nd-stage Project of Manwan Hydropower Station is arranged by the right bank.Its diversion system is composed of water intake,diversion tunnel and penstock.An introduction was made on the arrangement,hydraulic calculation and structural design of the diversion system
Keywords:Manwan Hydropower Station  2nd-stage project  water diversion system  design