首页 | 官方网站   微博 | 高级检索  
     

三峡工程建设的测量监理体制
引用本文:吝全奎. 三峡工程建设的测量监理体制[J]. 西北水电, 2004, 0(1): 54-57,68
作者姓名:吝全奎
作者单位:国家电力公司西北勘测设计研究院测绘工程大队,兰州 730030
摘    要:介绍三峡工程建设中的测量特点、测量监理体制、测量管理方法、测量成果审查、水电工程实行监理制的方法及专业实行集中管理的重要性和必要性,着重介绍左岸厂房电站、电站大坝的施工实施工程测量监理和各级测量单位责任制及其相互之间的关系、组织、协调问题。

关 键 词:三峡工程 水电工程建设 工程测量 测量管理
文章编号:1006-2610(2004)01-0054-04

Survey supervision system for construction of TGP
LIN Quan-kui. Survey supervision system for construction of TGP[J]. Northwest Water Power, 2004, 0(1): 54-57,68
Authors:LIN Quan-kui
Abstract:The survey features, supervision system, management method and result inspection in construction of the Three Gorges Project as well as the importance and necessity of supervision method and concentrate management in hydropower construction are described. Stress is laid on the engineering survey supervision of the left bank powerhouse and dam, the responsibility system of various survey levels and their organization, relationship and coordination.
Keywords:hydropower project construction  survey  supervision system  result inspection
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号