满足电网调峰的化学储能最优容量敏感因素分析
引用本文:朱刘柱,叶 斌,任曦骏,王 宝,任 可,陶文斌.满足电网调峰的化学储能最优容量敏感因素分析[J].电力需求侧管理,2022,24(2):48-53.
作者姓名:朱刘柱  叶 斌  任曦骏  王 宝  任 可  陶文斌
作者单位:国网安徽省电力有限公司经济技术研究院,合肥 230022,国网江苏省电力有限公司徐州供电分公司,江苏徐州 221005,华北电力大学现代电力研究院,北京102206
基金项目:国网安徽省电力有限公司经济技术研究院科技资助项目(SGAHJY00ZLJS1900049)
摘    要:近年来化学储能由于选址灵活、建设周期短、成本下降快的特点,逐渐在电网调峰中得到应用.然而化学储能用于电网调峰时的最优容量受哪些敏感因素影响以及如何影响,目前尚未得到充分研究.针对该内容,构建了用于调峰的化学储能最优容量配置模型,模型以系统总成本最小为目标,以目标规划年各类电源、负荷的规划或预测数据为边界,对各储能容量待...

关 键 词:调峰  化学储能  容量配置  敏感因素
收稿时间:2021/11/25 0:00:00
修稿时间:2022/1/20 0:00:00

Sensitive factors analysis of optimal capacity of battery energy storage system suitable for peak load regulation
ZHU Liuzhu,YE Bin,REN Xijun,WANG Bao,REN Ke,TAO Wenbin.Sensitive factors analysis of optimal capacity of battery energy storage system suitable for peak load regulation[J].Power Demand Side Management,2022,24(2):48-53.
Authors:ZHU Liuzhu  YE Bin  REN Xijun  WANG Bao  REN Ke  TAO Wenbin
Affiliation:Institute of Economy and Technology, State Grid Anhui Electric Power Co., Ltd., Hefei 230022, China;Xuzhou Power Supply Company, State Grid Jiangsu Electric Power Co., Ltd., Xuzhou 221005, China; Academy of Modern Electric Power Research, North China Electric Power University, Beijing 102206, China
Abstract:Due to flexible location, short construction cycle and rapid cost reduction, chemical energy storage has been applied to power grid peak load regulation in recent years. However, re-search on factors sensitive to optimal capacity of battery energy storage system suitable for peak load regulation is still insufficient.A model about optimal capacity of battery energy storage for peak load regulation is constructed. The model takes lowest social energy consumption cost as a goal, and planned or forecasted data of allkinds of power source and load in target planning year as boundary condition. The model makes full time production simulation foreach alternative capacity scheme of battery energy storage through-out the year, and solves it by mixed integer linear programming.Based on the work above, the sensitive factors that affect the optimal capacity of battery energy storage are summarized, and empirical research and analysis on the mode and degree of its influence are carried out. The results show that the energy storage factor, including unit investment cost and operating years, as well as demand factor such as peak load supply and low load adjustment, caninfluence the optimal capacity of battery energy storage and the total system cost.