全寿命周期成本分析在施工供水系统中的应用 |
| |
引用本文: | 任明珍,潘登宇.全寿命周期成本分析在施工供水系统中的应用[J].电网与水力发电进展,2009,25(9):60-61. |
| |
作者姓名: | 任明珍 潘登宇 |
| |
作者单位: | 中国水利水电第七工程局有限责任公司,成都 610225;中国水利水电第七工程局有限责任公司,成都 610225 |
| |
摘 要: | 兰滩水电站施工供水设计中,采用全寿命周期成本分析法,进行方案比较、分析和论证,为设计方案的决策提供更为全面的经济依据,更合理的控制投资,节约成本。水电站的施工供水系统应利用地形优势,优先考虑自流引水方案,降低施工供水系统的运行期费用。
|
关 键 词: | 戈兰滩水电站 全寿命周期成本分析 施工供水 成本控制 |
Application of LCC Analysis in Construction of Water Supply System Project |
| |
Authors: | REN Ming-zhen and PAN Deng-yu |
| |
Affiliation: | No.7 Construction Bureau of Sino-hydro Ltd., Chengdu 610025, Sichuan Province, China;No.7 Construction Bureau of Sino-hydro Ltd., Chengdu 610025, Sichuan Province, China |
| |
Abstract: | In the construction design of the water supply project, the LLC analysis is applied o the construction of the water supply system of the Gelantan hydropower station for comparing, verifying and selecting alternative proposals and for providing reliable and comprehensive data for decision-making. To control the investment and reduce the project cost, construction of the water supply system for a hydropower station shall make full use of the existing terrain conditions, and give priority to the automatic flow option to reduce the operation cost |
| |
Keywords: | Gelantan hydropower station LLC analysis construction of water supply project cost control |
本文献已被 维普 万方数据 等数据库收录! |
| 点击此处可从《电网与水力发电进展》浏览原始摘要信息 |
|
点击此处可从《电网与水力发电进展》下载全文 |