Optimization principle of combined surface and underground mining and its applications
作者姓名:CHEN  Jian-hong
作者单位:School of Resources and Safety Engineering,Central South University,Changsha 410083,China,School of Resources and Safety Engineering,Central South University,Changsha 410083,China,School of Resources and Safety Engineering,Central South University,Changsha 410083,China
基金项目:Project (59704004) supported by the National Natural Science Foundation of China,Project (2000) supported by Foundation for University Key Teacher by the Ministry of Education
摘    要:The pit limit optimization is discussed, which is one of the most important problems in the combined mining method, on the basis of the economic model of ore-blocks. A new principle of the limit optimization is put forward through analyzing the limitations of moving cone method under such conditions. With a view to recovering as much mineral resource as possible and making the maximum profit from the whole deposit, the new principle is to maximize the sum of gain from both open-pit and underground mining. The mathematical models along the horizontal and vertical directions and modules for software package (DM&MCAD) have been developed and tested in Tonglushan Copper Mine. It has been proved to be rather effective in the mining practice.

收稿时间:1 April 2003
修稿时间:8 June 2003

Optimization principle of combined surface and underground mining and its applications
Chen Jian-hong , Gu De-sheng and Li Jian-xiong.Optimization principle of combined surface and underground mining and its applications[J].Journal of Central South University of Technology,2003,10(3):222-225.
Authors:Chen Jian-hong  Gu De-sheng and Li Jian-xiong
Affiliation:(1) School of Resources and Safety Engineering, Central South University, 410083 Changsha, China
Abstract:The pit limit optimization is discussed, which is one of the most important problems in the combined mining method, on the basis of the economic model of ore-blocks. A new principle of the limit optimization is put forward through analyzing the limitations of moving cone method under such conditions. With a view to recovering as much mineral resource as possible and making the maximum profit from the whole deposit, the new principle is to maximize the sum of gain from both open-pit and underground mining. The mathematical models along the horizontal and vertical directions and modules for software package (DM&MCAD) have been developed and tested in Tonglushan Copper Mine. It has been proved to be rather effective in the mining practice.
Keywords:surface mining  underground mining  combined mining method  optimization model  open pit limit  block economic model