首页 | 官方网站   微博 | 高级检索  
     

Recent Progress of HT-7U Superconducting Tokamak
作者姓名:翁佩德
作者单位:WENG Pei-deInstitute of Plasma Physics,Chinese Academy of Sciences,Hefei 230031,China
基金项目:This work was supported by the National Meg-science Engineering Project of the Chinese Government.
摘    要:HT-7U is a superconducting tokamak. which is being constructed in Institute of Plasma Physics, Chinese Academy of Sciences. The mission of the HT-7U project is to develop a scientific and engineering basis of the steady state operation of advanced tokamak.The engineering design of the device has been optimized. The R&D program is going on. Short samples of the conductor and a CS model coil were tested. All the TF and PF coils will be manufactured and tested in Institute of Plasma Physics. Therefore, a 600-meter long jacketing line for cable-in-conduit conductors along with two winding machines, a set of VPI equipment and a test facility for the TF and PF coils are ready in ASIPP now. In this paper, the recent progress of the HT-7U is described.

关 键 词:HT-7U超导托卡马克装置  进展  等离子体物理  设计  应用  研究与开发  热学  制造业  检测设备  CS模型

Recent Progress of HT-7U Superconducting Tokamak
WENG Pei-deInstitute of Plasma Physics,Chinese Academy of Sciences,Hefei ,China.Recent Progress of HT-7U Superconducting Tokamak[J].Plasma Science & Technology,2002,4(6):1579-1584.
Authors:WENG Pei-deInstitute of Plasma Physics  Chinese Academy of Sciences  Hefei  China
Affiliation:WENG Pei-deInstitute of Plasma Physics,Chinese Academy of Sciences,Hefei 230031,China
Abstract:HT-7U is a superconducting tokamak, which is being constructed in Institute of Plasma Physics, Chinese Academy of Sciences. The mission of the HT-7U project is to develop a scientific and engineering basis of the steady state operation of advanced tokamak.The engineering design of the device has been optimized. The RfcD program is going on. Short samples of the conductor and a CS model coil were tested. All the TF and PF coils will be manufactured and tested in Institute of Plasma Physics. Therefore, a 600-meter long jacketing line for cable-in-conduit conductors along with two winding machines, a set of VPI equipment and a test facility for the TF and PF coils are ready in ASIPP now. In this paper, the recent progress of the HT-7U is described.
Keywords:HT-7U tokamak  recnt progress
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号