首页 | 官方网站   微博 | 高级检索  
     

前置反硝化曝气生物滤池的挂膜启动研究
引用本文:杨威, 张雷坤, 余华荣, 梁恒, 李圭白. 前置反硝化曝气生物滤池的挂膜启动研究[J]. 环境工程学报, 2014, 8(11): 4701-4706.
作者姓名:杨威  张雷坤  余华荣  梁恒  李圭白
作者单位:1. 哈尔滨商业大学环境工程系, 哈尔滨 150076; 2. 哈尔滨商业大学生命科学与环境科学研究中心, 哈尔滨 150076; 3. 哈尔滨工业大学环境科学与工程博士后流动站, 哈尔滨 150090; 4. 哈尔滨工业大学城市水资源与水环境国家重点实验室, 哈尔滨 150090
基金项目:黑龙江省自然科学基金资助项目(E200818);广东省教育部产学研结合项目(2012B091000029);黑龙江省政府博士后基金资助项目
摘    要:为了解前置反硝化曝气生物滤池(BAF)的启动规律,构建了小试规模的前置反硝化BAF,采用快速排泥、逐步增大水力负荷的策略考察了其启动过程中的污染物去除情况及启动特性.结果表明,在好氧柱水力负荷为2.04 m3/(m2·h),厌氧柱水力负荷为4.08 m3/(m2·h),回流比为100%,气水比为5.6:1的情况下,前置反硝化BAF的启动需要49 d.启动过程中好氧池中硝化细菌的成熟是启动的关键.厌氧池中的反硝化细菌的成熟标志着启动的完成.启动完成后,前置反硝化BAF的出水COD、NH3-N及NO3--N分别稳定在50、15和5 mg/L以下,满足国家一级A排放标准.

关 键 词:前置反硝化   曝气生物滤池   挂膜   启动   脱氮
收稿时间:2013-11-17

Study on start-up and film formation of pre-denitrification biological aerated filter
Yang Wei, Zhang Leikun, Yu Huarong, Liang Heng, Li Guibai. Study on start-up and film formation of pre-denitrification biological aerated filter[J]. Chinese Journal of Environmental Engineering, 2014, 8(11): 4701-4706.
Authors:Yang Wei  Zhang Leikun  Yu Huarong  Liang Heng  Li Guibai
Affiliation:1. Department of Environmental Engineering, Harbin University of Commerce, Harbin 150076, China; 2. Center of Research and Development on Life Science and Environmental Sciences, Harbin University of Commerce, Harbin 150076, China; 3. Post-Doctoral Stations of Environmental Science & Engineering, Harbin Institute of Technology, Harbin 150090, China; 4. State Key Laboratory of Urban Water Resource and Environment, Harbin Institute of Technology, Harbin 150090, China
Abstract:In order to understand the start-up of pre-denitrification biological aerated filter, a lab-scale pre-denitrification BAF was built and rapid sludge draining method with gradually increasing hydraulic load start-up strategy was adopted to examine the contaminants removal efficiencies and start-up characteristics. The results showed that it took 49 days to start-up the pre-denitrificaiton BAF under the operation condition of 2.04 m3/(m2·h)of the aerobic column hydraulic load and 4.08 m3/(m2·h) of anaerobic column hydraulic load, 100% of reflux ratio and 5.6:1 of gas-water ratio. The maturation of nitrifying bacteria in aerobic tank was the key of the start-up of pre-denitrification BAF. The maturation of denitrifying bacteria in anaerobic tank was the indication of the accomplishment of the start-up. After start-up, COD, NH3-N and NO3--N in the effluent were respectively lower than 50 mg/L, 15 mg/L, 5 mg/L, which met the GB18918-2002 1A discharged standard.
Keywords:pre-denitrification  biological aerated filter(BAF)  biofilm formation  start-up  nitrogen removal
本文献已被 CNKI 等数据库收录!
点击此处可从《环境工程学报》浏览原始摘要信息
点击此处可从《环境工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号