首页 | 官方网站   微博 | 高级检索  
     

泸定水电站3号消力池直立边坡管桩加固施工技术
引用本文:王行仁,赵龙飞,李越. 泸定水电站3号消力池直立边坡管桩加固施工技术[J]. 水力发电, 2011, 0(5)
作者姓名:王行仁  赵龙飞  李越
作者单位:中国葛洲坝集团三峡分公司泸定水电站施工项目部,四川,泸定,626100
摘    要:大渡河泸定水电站3号泄洪洞消力池左右边墙设计为高27 m的直立边坡,由于两侧边坡存在较大地质缺陷,边坡稳定性较差,因此采取了直立边坡岩体的预固结灌浆及钢管灌注桩加固措施,以增加岩体的完整性并形成连续幕墙,从而确保了边坡安全并加快了工程建设进度.

关 键 词:消力池  直立边坡  管桩加固  泸定水电站

Pipe Pile Reinforcement for the Vertical Slopes of No.3 Stilling Basin in Luding Hydropower Station
Wang Xingren,Zhao Longfei,Li Yue. Pipe Pile Reinforcement for the Vertical Slopes of No.3 Stilling Basin in Luding Hydropower Station[J]. Water Power, 2011, 0(5)
Authors:Wang Xingren  Zhao Longfei  Li Yue
Affiliation:Wang Xingren,Zhao Longfei,Li Yue(Luding Hydropower Station Construction Department of China Gezhouba Group Co.,Ltd Three Gorges Company,Luding 626100,Sichuan,China)
Abstract:The right and left side wall of stilling basin for the No.3 spillway tunnel in Luding Hydropower Station are designed as vertical slope with a height of 27 m.As the serious geological defects besides the stilling basin,the stability of slopes is poor.The rock mass surrounding the slopes are reinforced by taking pre-consolidation grouting and steel pipe piles to increase the integrity of rocks and form a continuous curtain wall.The safety of the slopes is guaranteed and the construction progress is speeded u...
Keywords:stilling basin  vertical slope  pipe pile reinforcement  Luding Hydropower Station  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号