首页 | 官方网站   微博 | 高级检索  
     

强风化岩中顶管施工顶力计算的理论分析
引用本文:刘锦洲,霍少磊,葛云峰.强风化岩中顶管施工顶力计算的理论分析[J].山西建筑,2010,36(10):123-124.
作者姓名:刘锦洲  霍少磊  葛云峰
作者单位:1. 中国地质大学(武汉)工程学院,湖北武汉,430074
2. 新疆煤田地质局,新疆乌鲁木齐,830000
摘    要:结合具体工程实例,对手掘式顶管在强风化岩中的顶力计算进行了理论分析,工程实践证明手掘式顶管在各类稳定地质情况下均可顺利施工,以使手掘式顶管拥有更大的发展前景。

关 键 词:手掘式顶管  强风化岩  顶力  摩阻力

On theoretical analysis of pipe jacking construction's jacking force calculation of strong decomposed rock
LIU Jin-zhon,HUO Shao-lei,GE Yun-feng.On theoretical analysis of pipe jacking construction's jacking force calculation of strong decomposed rock[J].Shanxi Architecture,2010,36(10):123-124.
Authors:LIU Jin-zhon  HUO Shao-lei  GE Yun-feng
Affiliation:LIU Jin-zhou HUO Shao-lei GE Yun-feng
Abstract:Combining with the project examples,the paper has the theoretical analysis of the jacking force calculation of the hand grubbing pipe jacking,and it is proved that the hand grubbing pipe jacking can be used in all sorts of stable geological situations,so as to create larger development for the hand grubbing pipe jacking.
Keywords:hand grubbing pipe jacking  strong decomposed rock  jacking force  frictional resistance  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号