管顶人孔井、测量塔的受力变形数值模拟及控制
引用本文:丁宇诚,宁进进. 管顶人孔井、测量塔的受力变形数值模拟及控制[J]. 水运工程, 2014, 0(9): 170-172
作者姓名:丁宇诚  宁进进
作者单位:中交一航局第二工程有限公司,山东青岛,266000
摘    要:某大型沉管工程的沉管艉端装有最高近42.2 m的人孔井和测量塔,其在浮运、安装过程中受到水流荷载、波浪荷载和风荷载的影响而存在受力变形。为了保证人孔井和测量塔的安全及测量塔的测量精度,对人孔井和测量塔的受力特性进行分析后,在人孔井和测量塔上添加抱箍结构,使其与测量塔呈刚性连接。

关 键 词:人孔井  测量塔  风荷载  水流荷载

Simulation and control of manholes and force and deformation of measurement tower
DING Yu-cheng and NING Jin-jin. Simulation and control of manholes and force and deformation of measurement tower[J]. Port & Waterway Engineering, 2014, 0(9): 170-172
Authors:DING Yu-cheng and NING Jin-jin
Affiliation:CCCC Second Engineering Co.,Ltd.,Qingdao 266000,China;CCCC Second Engineering Co.,Ltd.,Qingdao 266000,China
Abstract:At the end of every element of tunnel in a large tunnel engineering,there fit with nearly 42.2 m maximum height of manhole and measurement tower,which bear force by water load,wave load and wind load in transportation and placement.Adding a clamp structure to form a rigid connection with the measurement tower,we ensure the safety and accuracy.
Keywords:manhole  measurement tower  wind load  water load