鄱阳湖二期防洪工程流湖圩堤身防渗设计与分析
引用本文:刘仁德,徐晨. 鄱阳湖二期防洪工程流湖圩堤身防渗设计与分析[J]. 江西水利科技, 2004, 30(Z1): 54-56
作者姓名:刘仁德  徐晨
作者单位:江西省水利规划设计院,江西,南昌,330029
摘    要:通过鄱阳湖二期防洪工程流湖圩堤身防渗的设计与分析,针对流湖圩不同堤段的险情,选择不同的堤身防渗处理方案.供类似工程的堤身防渗设计参考.

关 键 词:堤身防渗  锥探灌浆  设计  鄱阳湖  防洪工程
文章编号:1004-4701(2004)0S-0054-03
修稿时间:2003-09-28

THE ANTI-SEEPAGE DESIGN AND ANALYSIS OF THE LEVEE BODY OF LIUHU DYKE ON THE SECOND-STAGE FLOOD CONTROL PROJECT OF POYANG LAKE
LIU Ren-de,XU Cen. THE ANTI-SEEPAGE DESIGN AND ANALYSIS OF THE LEVEE BODY OF LIUHU DYKE ON THE SECOND-STAGE FLOOD CONTROL PROJECT OF POYANG LAKE[J]. Jiangxi Hydraulic Science & Technology, 2004, 30(Z1): 54-56
Authors:LIU Ren-de  XU Cen
Abstract:Based on the anti-seepage design and analysis of the levee body of Liuhu dyke on the second-stage flood control project of Poyang Lake,according to the danger condition of the different dyke stage of Liuhu dyke,the different anti-seepage treatment schemes is selected.It can be referred for the anti-seepage design of the levee body of similar engineering.
Keywords:Anti-seepage of levee body  Cone-detect grouting  Design  Poyang Lake  Flood contreol engineering