龙滩碾压混凝土重力坝的设计特点
引用本文:冯树荣,肖峰.龙滩碾压混凝土重力坝的设计特点[J].水力发电,2007,33(4):18-19,61.
作者姓名:冯树荣  肖峰
作者单位:中国水电顾问集团中南勘测设计研究院,湖南,长沙,410014
摘    要:龙滩碾压混凝土重力坝工程量巨大,最大坝高初期建设时为192m,最终为216.5m,技术难度大。设计中针对碾压混凝土施工特点,从枢纽布置、坝体结构、混凝土配合比、温控、施工方案等方面进行了深入的研究,形成了有特色的设计方案,实现了碾压混凝土连续快速施工。

关 键 词:枢纽布置  碾压混凝土  配合比设计  温度控制  龙滩工程
文章编号:0559-9342(2007)04-0018-02
修稿时间:2007-03-20

Design Features of Longtan RCC Gravity Dam
Feng Shurong,Xiao Feng.Design Features of Longtan RCC Gravity Dam[J].Water Power,2007,33(4):18-19,61.
Authors:Feng Shurong  Xiao Feng
Affiliation:Mid-South Design and Research Institute for Hydroelectric Projects CHECC, Changsha Hunan 410014
Abstract:The Longtan Hydropower Project RCC gravity dam has a huge project quantity. Its initial maximum dam height during its early construction period is 192m and finally its height will be 216.5m so that its technical difficulty is big. In the design,we has conducted an in-depth study on its general layout dam body structure,concrete mix proportions,temperature control as well as construction scheme,etc,according to the characteristics of Rcc construction,so that we formed a featured design altematives and achieved continuous and fast RCC construction.
Keywords:general layout  RCC  mix proportion  temperature control  Longtan Hydropower Project
本文献已被 CNKI 维普 万方数据 等数据库收录!