丹江口大坝加高工程中原坝体裂缝处理工艺
引用本文:姜俊峰. 丹江口大坝加高工程中原坝体裂缝处理工艺[J]. 四川水力发电, 2009, 28(Z1)
作者姓名:姜俊峰
作者单位:葛洲坝集团第二工程有限公司,四川,成都,610091
摘    要:丹江口大坝加高工程的施工是按照结构设计进行的,对丹江口工程原坝体裂缝的处理工作是整个大坝加高工程施工的重点之一,介绍了该工程裂缝的成因及处理工艺.

关 键 词:丹江口大坝  裂缝处理  工艺

Treatment for Cracks in Existing Dam Body during Heightening of Danjiangkou Dam
JIANG Jun-feng. Treatment for Cracks in Existing Dam Body during Heightening of Danjiangkou Dam[J]. Sichuan Water Power, 2009, 28(Z1)
Authors:JIANG Jun-feng
Affiliation:The Second Engineering Corporation of Gezhouba Group;Chengdu;Sichuan;610091;China
Abstract:Construction of Danjiangkou dam heightening project was carried out based on structural design.One of major constructions for the dam heightening project is treatment for cracks in existing dam body.Causes and treatment of cracks in dam are presented in this paper.
Keywords:Danjiangkou dam  crack treatment  