首页 | 官方网站   微博 | 高级检索  
     

海上超高温高压探井弃井水泥塞技术
引用本文:李祝军,韩成,魏安超,刘贤玉,杨玉豪. 海上超高温高压探井弃井水泥塞技术[J]. 钻井液与完井液, 2019, 36(5): 617-621. DOI: 10.3969/j.issn.1001-5620.2019.05.016
作者姓名:李祝军  韩成  魏安超  刘贤玉  杨玉豪
作者单位:中海石油(中国)有限公司湛江分公司, 广东湛江 524057
基金项目:国家"十三五"重大科技专项子课题"莺琼盆地高温高压天然气富集规律与勘探开发关键技术(三期)"(2016ZX05024-005);中海油"十三五"重点科技项目"莺琼盆地高温高压完井和测试关键技术研究"(CNOOCKJ135ZDXM 24 LTD ZJ 03)
摘    要:莺琼盆地超高温高压探井高密度弃井水泥塞面临着流动性与沉降稳定性矛盾突出,水泥石强度易衰退,封固段长,温差大,顶部强度发展缓慢,安全密度窗口窄,水泥浆漏失与气窜风险并存等难题。通过使用球形微锰矿加重水泥浆,改善高密度水泥浆流变性,同时提高其沉降稳定性,优选高温成膜防气窜剂,降低气窜风险,优化硅粉加量,提高水泥石高温抗压强度,强化隔离液防漏性能,配合挤入式固井注水泥塞工艺,形成了一套莺琼盆地超高温高压弃井水泥塞技术。该技术在莺琼盆地应用最高井底静止温度达213℃,水泥浆最高密度达2.50 g/cm3。现场应用表明,弃井水泥塞流动性及沉降稳定性好,高温强度发展快且不衰退,稠化时间稳定,具有良好的防窜及防漏能力,均成功封固住高压气层。 

关 键 词:弃井   水泥塞   超高温   高压   高密度水泥浆   莺琼盆地
收稿时间:2019-06-07

The Technology of Setting Cement Plug for Offshore Ultra High Temperature and Ultra High Pressure Abandoned Wells
LI Zhujun,HAN Cheng,WEI Anchao,LIU Xianyu,YANG Yuhao. The Technology of Setting Cement Plug for Offshore Ultra High Temperature and Ultra High Pressure Abandoned Wells[J]. Drilling Fluid & Completion Fluid, 2019, 36(5): 617-621. DOI: 10.3969/j.issn.1001-5620.2019.05.016
Authors:LI Zhujun  HAN Cheng  WEI Anchao  LIU Xianyu  YANG Yuhao
Affiliation:Zhanjiang Branch Company, CNOOC, Zhanjiang, Guangdong 524057
Abstract:High density abandonment well plugs are set for ultra high temperature ultra high pressure exploratory wells drilled in Yingqiong Basin. Several problems, such as the conflict between mobility and sedimentation stability of the cement slurry, deterioration of the strength of the set cement, long section of cementing, big temperature difference, slow strength development at the top of cement, narrow safe drilling windows, loss of cement slurry and gas channeling etc., were encountered when setting the abandonment plugs. Several measures were taken to resolve these problems. First, spherical manganese ore powder was used to weight the cement slurry and to improve the rheology and sedimentation stability of the cement slurry. Second, a high temperature filming anti gas channeling agent was used to mitigate the risk of gas channeling. Third, an optimized amount of micro silica was used to increase the high temperature compressive strength of the set cement. Fourth, the quality of the spacer was optimized to enhance its ability to prevent loss of cement slurry. Finally, the cement slurry was squeezed into the hole to eliminate potential downhole problems. These measures have been successfully used in cement wells with maximum static bottom hole temperature of 213℃, and the highest density of cement slurry used was 2.50 g/cm3. Field operation showed that the cement slurry for setting abandonment plug has good mobility and sedimentation stability. The high temperature strength of the set cement developed fast and did not deteriorate. The cement slurry had stable thickening time, good anti-channeling and cement slurry loss preventing performance. All high pressure gas zones were successfully sealed off.
Keywords:Abandoned well  Ultra high temperature  High Pressure  High density cement slurry  Yingqiong Basin  
本文献已被 CNKI 等数据库收录!
点击此处可从《钻井液与完井液》浏览原始摘要信息
点击此处可从《钻井液与完井液》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号