首页 | 官方网站   微博 | 高级检索  
     

E级联合循环供热机组调峰能力分析
引用本文:张利,张子玉,孔祥灿,姚颢,谷青峰,于越,周伟伟,钱江波,孔筱叶.E级联合循环供热机组调峰能力分析[J].中国电力,2018,51(12):1-6,28.
作者姓名:张利  张子玉  孔祥灿  姚颢  谷青峰  于越  周伟伟  钱江波  孔筱叶
作者单位:1. 国网天津市电力公司电力科学研究院, 天津 300384;2. 华北电力大学 动力工程系, 河北 保定 071003;3. 中国测试技术研究院辐射研究所, 四川 成都 610000
基金项目:国家重点研发计划项目(2017YFC0704200);中央高校基本科研业务资助项目(2016MS103);广东省省级科技项目(2015B010101002)。
摘    要:以PG9171E型燃气轮机为顶循环的联合循环机组作为研究对象,利用EBSILON软件搭建了燃气-蒸汽联合循环系统变工况模型,通过改变供热抽汽量以及相应边界条件,分析了抽汽量变化对联合循环调峰能力的影响情况。结果表明:在供热抽汽量0~135 t/h内,机组调峰裕度为32.16~213.65 MW。比较了不同抽汽量下联合循环机组最小、最大发电功率,发现随着抽汽量的增加,机组的最小发电功率增大而最大发电功率减小。研究结果可为联合循环机组的经济运行和电网调峰决策提供重要参考。

关 键 词:联合循环  变工况  供热抽汽量  调峰  
收稿时间:2017-08-24
修稿时间:2018-05-24

Analysis on Peak Load Regulation of E-stage Combined Cycle Heating Unit
ZHANG Li,ZHANG Ziyu,KONG Xiangcan,YAO Hao,GU Qingfeng,YU Yue,ZHOU Weiwei,QIAN Jiangbo,KONG Xiaoye.Analysis on Peak Load Regulation of E-stage Combined Cycle Heating Unit[J].Electric Power,2018,51(12):1-6,28.
Authors:ZHANG Li  ZHANG Ziyu  KONG Xiangcan  YAO Hao  GU Qingfeng  YU Yue  ZHOU Weiwei  QIAN Jiangbo  KONG Xiaoye
Affiliation:1. Tianjin Electric Power Science & Research Institute, Tianjin 300384, China;2. Department of Power Engineering, North China Electric Power University, Baoding 071003, China;3. National institute of measurement testing technology, Chengdu 610000, China
Abstract:Taking the PG9171E gas turbine as the top cycle unit as the research object, the gas-steam combined cycle system model for varying operation conditions is established by using the EBSILON software. The influence of the extraction rate variation on the peak-shaving capacity of the combined cycle is analyzed by changing the steam extraction and boundary conditions. The results show that the peak regulation margin of the unit is 32.16~213.65 MW when the steam extraction is lower than 135t/h. The minimum and maximum generation power of the combined cycle unit with different extraction capacity are compared in this paper. It is found that the minimum generation power increases and the maximum generation power decreases with the increase of the extraction capacity. The results can provide an important reference for the economic operation of combined cycle units and the decision of power grid peak-shaving.
Keywords:combined cycle  varying operation conditions  steam extraction  peak load regulation  
本文献已被 CNKI 等数据库收录!