双岭电站堰面模板施工
引用本文:陈国伟. 双岭电站堰面模板施工[J]. 广西水利水电, 2011, 0(6): 44-45
作者姓名:陈国伟
作者单位:中国水利建设集团辽宁工程局,辽宁沈阳,111000
摘    要:双岭电站堰面采用近似折线型,在施工中如何保证堰面曲线精度是一个至关重要的问题,介绍了在施工中采取定型模、定型桁架、拉模和人工抹面的施工方法.

关 键 词:堰面  定型模  定型桁架  拉模  人工抹面  双岭电站

Weir surface formwork construction of Shuangling Hydropower Project
CHEN Guo-wei. Weir surface formwork construction of Shuangling Hydropower Project[J]. Gx Water Resources & Hydropower Engineering, 2011, 0(6): 44-45
Authors:CHEN Guo-wei
Affiliation:CHEN Guo-wei (SINOHYDRO Liaoning Construction Bureau Co.,Ltd.,Shenyang 111000,China)
Abstract:The weir surface of Shuangling Hydropower Project is design as approximate broken crest.It is very important to keep accurate weir surface curvature during construction.An introduction was made on the construction methods such as type formwork,type truss,draw formwork and artificial plastering.
Keywords:Weir surface  type formwork  type truss  draw formwork  artificial plastering  Shuangling Hydropower Project