涪陵新区站前大道二期设计方案探讨
引用本文:彭家胜. 涪陵新区站前大道二期设计方案探讨[J]. 工程建设与设计, 2014, 0(12): 86-90,93
作者姓名:彭家胜
作者单位:重庆市涪陵区新城区开发(集团)有限公司,重庆,408000
摘    要:对重庆市涪陵新区站前大道二期设计方案进行了总结与分析,从平面线形、纵断面线形的推荐线形三个方案、比较线形三个方案,桥梁方案、工程规划、工程投资等方面对比,通过比较,最终确定了按推荐线形方案进行设计。

关 键 词:工程  站前大道  设计方案  探讨

Study of Two Stage Design Scheme of Fuling New District Crane Fung Avenue
PENG Jia-sheng. Study of Two Stage Design Scheme of Fuling New District Crane Fung Avenue[J]. Construction & Design for Project, 2014, 0(12): 86-90,93
Authors:PENG Jia-sheng
Affiliation:PENG Jia-sheng (The Development of NewUrban Areas of ChongqingCityFuling Distriet(Group)Co.Ltd.,Changqing 408000,China)
Abstract:This article has carded on the summary and analysis of Chongqing New District of Fuling City Station Road two to design, from the recommended alignment plane alignment, vertical alignment of the three plan, three plan more linear, bridge scheme, project planning, project investment and other aspects of comparison,by comparison, to determine the final design according to the recommended alignment.
Keywords:engineering  station road  design plan  study