计及配网停电损失的DG双层规划方法
引用本文:钟浩,郑城宇,李世春.计及配网停电损失的DG双层规划方法[J].电测与仪表,2021,58(3):60-67.
作者姓名:钟浩  郑城宇  李世春
作者单位:三峡大学梯级水电站运行与控制湖北省重点实验室,湖北宜昌443002;三峡大学梯级水电站运行与控制湖北省重点实验室,湖北宜昌443002;三峡大学梯级水电站运行与控制湖北省重点实验室,湖北宜昌443002
基金项目:国家自然科学基金资助项目
摘    要:分布式电源发电商与配电网公司利益共赢是促进能源战略落地的重要保障。文中提出了一种计及配电网停电损失的分布式电源双层规划方法。上层模型以DG发电商收益最大化为目标,基于网损灵敏度方法确定DG候选安装位置,对DG的选址和定容进行优化;下层模型以配电网公司净收益最大化为目标,通过孤岛划分方法动态优化分段开关安装位置,减少配电网停电损失,同时实现无功补偿装置最优配置。采用遗传算法对上述模型进行求解,通过IEEE 33节点算例进行仿真分析,结果表明所述模型和方法可以在促进DG消纳的同时降低配电网停电损失,实现双方的利益共赢。

关 键 词:孤岛划分  无功补偿  DG发电商  配电网公司  双层规划
收稿时间:2020/3/13 0:00:00
修稿时间:2020/3/13 0:00:00

Bi-level planning method of DG considering outage loss of distribution network
Zhong Hao and Zheng Chengyu.Bi-level planning method of DG considering outage loss of distribution network[J].Electrical Measurement & Instrumentation,2021,58(3):60-67.
Authors:Zhong Hao and Zheng Chengyu
Affiliation:(Hubei Provincial Key Laboratory for Operation and Control of Cascaded Hydropower Station,China Three Gorges University,Yichang 443002,Hubei,China)
Abstract:A win-win situation for distributed power generators and distribution network companies is an important guarantee to promote the implementation of energy strategies.This paper proposes a bi-level planning method of distributed power generation that takes into account the power outage loss of the distribution network.Based on the DG candidate installation location determined by the network loss sensitivity method,the upper level model aims at maximizing the revenue of DG generators,and optimizes the location and capacity of DG.The lower level model aims to maximize the net income of the distribution network company.It adopts the island division method to dynamically optimize the installation position of the sectionalized switch,reduce the outage loss of the distribution network,and realize the optimal configuration of the reactive power compensation device.The genetic model is used to solve the above models,and the simulation analysis is performed through an IEEE 33-node example.The results show that the proposed model and method can reduce the power outage loss of the distribution network while promoting DG dissipation,and achieve a win-win situation for both parties.
Keywords:island division  reactive power compensation  DG generator  distribution network company  bi-level planning
本文献已被 CNKI 维普 万方数据 等数据库收录!