首页 | 官方网站   微博 | 高级检索  
     


Integrated vendor--buyer inventory system with sublot sampling inspection policy and controllable lead time
Authors:Kun-Shan Wu  Liang-Yuh Ouyang  Chia-Huei Ho
Affiliation:1. Department of Business Administration , Tamkang University , Tamsui, Taipei 251, Taiwan kunshan@mail.tku.edu.tw;3. Department of Management Sciences and Decision Making , Tamkang University , Tamsui, Taipei 251, Taiwan;4. Department of Computer Science and Information Engineering , Ming Chuan University , Gwei Shan, Taoyuan 333, Taiwan
Abstract:This article investigates the impact of inspection policy and lead time reduction on an integrated vendor--buyer inventory system. We assume that an arriving order contains some defective items. The buyer adopts a sublot sampled inspection policy to inspect selected items. The number of defective items in the sublot sampling is a random variable. The buyer's lead time is assumed reducible by adding crash cost. Two integrated inventory models with backorders and lost sales are derived. We first assume that the lead time demand follows a normal distribution, and then relax the assumption about the lead time demand distribution function and apply the minimax distribution-free procedure to solve the problem. Consequently, the order quantity, reorder point, lead time and the number of shipments per lot from the vendor to the buyer are decision variables. Iterative procedures are developed to obtain the optimal strategy.
Keywords:Integrated inventory model  Defective items  Sub-lot sampling  Lead time reduction  Minimax distribution-free procedure
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号