南水北调西线工程方案优化
引用本文:张金良,马新忠,景来红,杨立彬. 南水北调西线工程方案优化[J]. 南水北调与水利科技(中英文), 2020, 18(5): 109-114
作者姓名:张金良  马新忠  景来红  杨立彬
作者单位:( 1. 黄河勘测规划设计研究院有限公司, 郑州 450003; 2. 中国国际工程咨询有限公司, 北京 100044)
基金项目:国家自然科学基金( 51569025) ; 国家重点研发计划项目( 2018YFC1508706)
摘    要:通过收集调研大量水文、地质、水资源、工程技术资料, 在现有研究基础上论述西线工程方案优化, 提出工程研 究面临的主要问题; 利用多指标比对法, 从西线工程调水断面下移自流方案和抽水方案入手, 通过调水河流可调水 量、环境影响、移民范围、投资费用和经济效益等指标探讨方案的优劣, 论证工程下移自流方案的可行性与优越性。 同时, 为减轻调水对生态、环境、社会等方面的影响, 分析并拟定金沙江、雅砻江、大渡河多年平均年调水总量为 170 亿 m3。研究成果可为未来工程建设决策提供重要技术依据。

关 键 词:南水北调西线   方案优化   调水需求   调水影响   水量配置

Plan optimization of the West Route of South-to-North Water Diversion Project
ZHANG Jinliang,MA Xinzhong,JING Laihong,YANG Libin. Plan optimization of the West Route of South-to-North Water Diversion Project[J]. South-to-North Water Transfers and Water Science & Technology, 2020, 18(5): 109-114
Authors:ZHANG Jinliang  MA Xinzhong  JING Laihong  YANG Libin
Affiliation:( 1. Yellow River Engineering Consulting Co . , Ltd, Zhengz hou 450003, China; 2. China Inter national Engineering Consulting Corpor ation, Beijing 100037, China)
Abstract:Through collecting and investigating a large amount of hydrology , geology , water resources, and engineering technical data, the paper discusses the optimization of the western route project scheme, and puts forward the main problems faced by the eng ineering research on the basis of the existing research; using the multi-index comparison method, starting from the water diversion section downward moving gravity flow scheme and pumping scheme of the west line project , discuss the pros and cons of the plan th rough indicators such as the adjustable river water volume, environmental impact, resettlement scope, investment cost and economic benefit, and demonstrate the feasibility and superiority of the project shifting the gravity flow plan. Simultaneously , in order to reduce the impact of water transfer on ecology , environment, society and other aspects, the Jinsha River, Ya long River , and Dadu River have been analyzed and drafted for an average annual water transfer volume of 17 ×109 m3 . The research results can provide an important technical basis for future engineering construction decisions.
Keywords:West Route of South-to- North Water Diversion   plan optimization   water diversion demand   water diversion impact  water allocation