首页 | 官方网站   微博 | 高级检索  
     

山区输电线路岩石接地体改造方法
引用本文:刘尧兵.山区输电线路岩石接地体改造方法[J].贵州电力技术,2010(11):51-52.
作者姓名:刘尧兵
作者单位:六盘水供电局,贵州六盘水553001
摘    要:通过对电力系统接地的分析来采取一种适合山区输电线路杆塔接地的措施。

关 键 词:接地电阻  接地电极  接地改造  接地模块

Reforming measures of rock as grounding body for transmission lines at mountain area based on the theoretical calculation
Liu Yaobing.Reforming measures of rock as grounding body for transmission lines at mountain area based on the theoretical calculation[J].Guizhou Electric Power Technology,2010(11):51-52.
Authors:Liu Yaobing
Affiliation:Liu Yaobing (Liupanshui Power Supply Bureau, IAupanshui 553001 Guizhou, China)
Abstract:Reforming of tower grounding resistance is an important measure for ensuring safe operation of transmission line in the lightning state, an important measure, practical measure is got by the analysis of power system grounding and time .
Keywords:grounding resistance  grounding electrodes  grounding reform  grounding module)
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号