运用Peck公式对某顶管工程地面沉降的预测探讨
引用本文:蔡文俊.运用Peck公式对某顶管工程地面沉降的预测探讨[J].路基工程,2016,0(6):64-67.
作者姓名:蔡文俊
作者单位:西南交通大学土木工程学院, 成都 610031
摘    要:基于广州市某分洪道顶管工程实测所得的地面沉降数据,探讨Peck公式在预测顶管施工引起地面沉降中的适用性,并借助函数拟合的方法,修正理论Peck公式下沉降曲线与实测沉降曲线的偏差。引入地表最大沉降修正系数α及沉降槽宽度修正系数β,通过推算和验证,当α和β分别介于0.229~0.809,0.176~0.324时,可利用修正Peck公式预测该地区下顶管施工引发地面沉降的大小。

关 键 词:Peck公式    函数拟合    地面沉降    顶管
收稿时间:2019-11-11

Discuss on Prediction of Ground Subsidence in a Pipe-jacking Engineering by Peck Formula
Abstract:On the basis of the ground settlement data measured in the pipe-jacking of floodway works in Guangzhou, the applicability of Peck formula in predicting ground subsidence caused by pipe-jacking was discussed, and then by means of function fitting, the deviation between the subsidence curve got by Peck formula and by measurement, was corrected. Thus, maximum surface subsidence correction coefficient α and settlement trough width correction coefficient β were introduced. Through calculation and verification, it is concluded that, when the α is between 0.229 and 0.809 and β between 0.176 and 0.324, the corrected Peck formula may be used to predict the ground subsidence caused by pipe-jacking in this region.
Keywords:
本文献已被 CNKI 等数据库收录!
点击此处可从《路基工程》浏览原始摘要信息
点击此处可从《路基工程》下载全文