煤矿井下物联网时间同步信息传输延迟估计
引用本文:陈珍萍,黄友锐,唐超礼,曲立国.煤矿井下物联网时间同步信息传输延迟估计[J].工矿自动化,2014(12):37-41.
作者姓名:陈珍萍  黄友锐  唐超礼  曲立国
作者单位:安徽理工大学电气与信息工程学院
基金项目:国家自然科学基金资助项目(51274011,61300001,51104003)
摘    要:针对煤矿井下巷道中无线传输延迟存在很大随机性,现有时间同步算法因无法确定延迟分布类型和参数而难以直接应用的问题,提出了一种基于被动测量的物联网时间同步信息传输延迟估计方法。在煤矿井下物联网感知层中增加一类评估节点,被动侦听感知节点间传输的时间同步信息包,获取传输延迟数据。评估节点基于极大似然估计法估计不同分布规律下的分布参数,根据Kullback-Leibler差异值确定最优分布规律;采用对数似然比确定同种分布规律下的参数突变,检测结果作为评估节点发送延迟分布规律和参数给汇聚节点的触发条件。仿真结果表明,该方法能够准确检测延迟分布规律的类型及分布参数突变。

关 键 词:煤矿井下  物联网  时间同步  传输延迟  被动测量  参数估计  突变检测

Estimation of transmission delay of time synchronization information for Internet of things of coal mine underground
CHEN Zhenping;HUANG Yourui;TANG Chaoli;QU Liguo.Estimation of transmission delay of time synchronization information for Internet of things of coal mine underground[J].Industry and Automation,2014(12):37-41.
Authors:CHEN Zhenping;HUANG Yourui;TANG Chaoli;QU Liguo
Affiliation:CHEN Zhenping;HUANG Yourui;TANG Chaoli;QU Liguo;School of Electrical and Information Engineering,Anhui University of Science and Technology;
Abstract:For problems that wireless transmission delay in tunnels of coal mine underground was random greatly and current time synchronization algorithms could not be applied directly in coal mine underground because of inability to determine delay distribution and parameters,an estimation method of transmission delay of time synchronization information for Internet of things was proposed based on passive measurement.A class of evaluation node is added to perception layer of Internet of things of coal mine underground for overhearing passively time synchronization packets among perception nodes to acquire transmission delay data.Then parameters under different distribution regularities are estimated by the evaluation nodes based on the maximum likelihood estimation method and optimal distribution regularity is determined according to Kullback-Leibler difference value.Parameter mutation is detected by using loglikelihood-ratio for determining whether the evaluation nodes send delay distribution regularity and parameters to sink nodes.The simulation results show that the method detects mutation of classification of delay distribution regularity and distribution parameters accurately.
Keywords:coal mine underground  Internet of things  time synchronization  transmission delay  passive measurement  parameter estimation  mutation detection