首页 | 官方网站   微博 | 高级检索  
     

尾矿坝静力稳定分析的探讨与建议
引用本文:何秉顺.尾矿坝静力稳定分析的探讨与建议[J].中国安全生产科学技术,2014,10(10):81-85.
作者姓名:何秉顺
作者单位:(中国水利水电科学研究院, 北京100038)
摘    要:尾矿坝不同于传统水库土石坝,不应完全按照传统土石坝的稳定分析方法。探讨了上游式尾矿坝静力稳定分析中的常见问题,分析了尾矿坝中孔隙水压力与超孔隙水压力来源,提出dp不大于005mm的尾矿坝年上升速率应不大于20m/a,对于上升速度过快的尾矿坝内应增设排水设施,以利于超孔隙水压力及时消散。在抗滑稳定分析方面,依据土力学的基本原理,明确了有效应力与总应力稳定分析方法的适用条件,将尾矿坝生命周期初期坝施工结束期、堆坝期、退役期等三个阶段,分别采用不同的稳定分析方法与强度参数。还讨论了尾矿坝中的两种特殊材料饱和松

关 键 词:尾矿坝  沉积尾矿  总应力法  有效应力法  排水强度  不排水强度

Discussion and suggestions on static stability analysis of tailing dam
HE Bing-shun.Discussion and suggestions on static stability analysis of tailing dam[J].Journal of Safety Science and Technology,2014,10(10):81-85.
Authors:HE Bing-shun
Affiliation:(China Institute of Water Resource and Hydropower Research, Beijing 100038, China)
Abstract:The tailing dam is different from the traditional earth and rockfill dams of the reservoirs, so the slope stability analysis method for traditional dam should not be adopted to the tailing dam completely. In this paper, some common problems encountered in the static stability analysis of the upstream tailing dam were discussed. The sources of pore water pressure and excess pore water pressure were analyzed, and it was proposed that the raising velocity per year for the dam with dp being not exceed 0.05mm should not exceed 20m/a. For the dam with over-rapid raising velocity, the drain apparatus should be added in the dam to facilitate the timely disappearance of excess pore water pressure. In the aspect of anti-sliding stability analysis, according to the basic principle of soil mechanics, the applicable conditions of effective stress and total stress stability analysis methods were defined. The life span of a tailing dam was divided into three periods, including starter dam construction ending period, embankment period and retired period, where different stability analysis methods and corresponding strength parameters should be used in different periods. At last, the strength parameters of two kinds of special materials, saturated loose sand and tailing silt, in tailing dam were discussed, and it was put forward that the characteristics of static liquefaction for saturated loose sand and under consolidated for tailing silt should be noticed in stability analysis. For the saturated loose sand bigger than critical void ratio, under a certain triggering conditions, the steady state strength can be applied. For the under consolidated tailing silt, the undrained strength should be estimated by applying non-consolidation and non-draining strength index or cu/p′.
Keywords:tailing dam  deposited tailing  total stress method  effective stress method  drained strength  undrained strength
本文献已被 CNKI 等数据库收录!
点击此处可从《中国安全生产科学技术》浏览原始摘要信息
点击此处可从《中国安全生产科学技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号