沈阳地铁二号线盾构施工测量
引用本文:郝亚东,赵杰,王磊.沈阳地铁二号线盾构施工测量[J].工程勘察,2011(4):69-72.
作者姓名:郝亚东  赵杰  王磊
作者单位:黄河水利职业技术学院;开封市规划勘测设计研究院;
摘    要:结合沈阳地铁二号线施工实例,探讨盾构施工中不同阶段的测量方法,根据盾构机的结构、姿态、定位特点,结合现代工程测量新技术,从理论和方法上对盾构施工测量进行深入研究并采取有效测量措施,保证盾构以正确姿态按设计要求掘进.

关 键 词:地铁  盾构  施工测量

Surveying methods for shield construction work used in Shenyang metro line two
Hao Yadong,Zhao Jie,Wang Lei.Surveying methods for shield construction work used in Shenyang metro line two[J].Geotechnical Investigation & Surveying,2011(4):69-72.
Authors:Hao Yadong  Zhao Jie  Wang Lei
Affiliation:Hao Yadong1,Zhao Jie1,Wang Lei2(1.Yellow River Conservancy Vocational And Technical College,Kaifeng 475003,China,2.Kaifeng Urban Planning and Design Institute,Kaifeng 475000,China)
Abstract:Based on Shenyang metro line two construction work,methodology for different stages of shield tunneling is proposed so as to measure the structure,posture,and position of the shield by using new surveying technologies.The new method can take measurements effectively and ensure the correct posture of the shield during the tunneling work.
Keywords:metro  shield  construction survey  