首页 | 官方网站   微博 | 高级检索  
     


Production planning in automotive powertrain plants: a case study
Authors:Idris Lalami  Yannick Frein
Affiliation:Univ. Grenoble Alpes, CNRS, Grenoble INP, G-SCOP, F-38000 Grenoble, France
Abstract:Based on a real case study from the automotive industry, this paper deals with production planning in powertrain plants. We present an overview of the production planning process and propose a mixed integer linear programme to determine the production quantities of each product over a planning horizon of several days. Then, using real data of an engine assembly line, we simulate the performance obtained through the proposed model within a rolling horizon planning process. We perform multiple tests in order to evaluate the impact of two parameters involved in this process: planning frequency and frozen horizon length. Furthermore, in order to illustrate the value of improving coordination between engine plants and their customers, we evaluate the impact of the quality of demand information (orders and forecasts). We analyse the simulation results and provide insights and recommendations in order to achieve a good trade-off between service level, inventory, and planning stability.
Keywords:production planning  mixed integer linear programme  rolling horizon  planning frequency  frozen horizon  automotive industry
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号