首页 | 官方网站   微博 | 高级检索  
     

主动配电网供电能力实时评估方法
引用本文:朱静,高亚静,刘建鹏,程华新,梁海峰,李鹏. 主动配电网供电能力实时评估方法[J]. 中国电力, 2015, 48(12): 96-102. DOI: 10.11930/j.issn.1004-9649.2015.12.96.6
作者姓名:朱静  高亚静  刘建鹏  程华新  梁海峰  李鹏
作者单位:1. 华北电力大学 新能源电力系统国家重点实验室,河北 保定 071003;2. 清华大学 电力系统国家重点实验室,北京 100084
基金项目:国家863高技术基金资助项目(2015AA050104); 清华大学电力系统国家重点实验室资助项目(SKLD14KM02)
摘    要:随着主动配电网的不断成熟,科学地对它的供电能力进行灵活的实时评估,找到并突破供电瓶颈,才能兼顾配电网运行的经济性、可靠性以及安全性。针对分布式电源出力的不确定性以及电网负荷周期性变化特点,提出了一种主动配电网供电能力实时评估方法。考虑了配电网中多种分布式电源接入的情况,利用预测技术得到未来时刻的负荷及分布式电源的出力,以配电网能够承担的最大负荷为目标函数,以系统的安全运行要求为约束条件,建立了数学模型。该模型不仅能够对未来一段时间内配电网的供电能力和供电裕度进行实时评估,还能够给出限制系统供电能力的供电瓶颈序列,从而使调度人员能够根据评估结果提前采取相应措施以保证电网运行的安全性和可靠性,并针对具体的瓶颈设备进行改造,提高系统的供电能力。

关 键 词:分布式电源  主动配电网  供电能力  实时评估  供电瓶颈  
收稿时间:2015-05-25

Real-Time Evaluation for Load Capability of Active Distribution Network
ZHU Jing,GAO Yajing,LIU Jianpeng,CHENG Huaxin,LIANG Haifeng,LI Peng. Real-Time Evaluation for Load Capability of Active Distribution Network[J]. Electric Power, 2015, 48(12): 96-102. DOI: 10.11930/j.issn.1004-9649.2015.12.96.6
Authors:ZHU Jing  GAO Yajing  LIU Jianpeng  CHENG Huaxin  LIANG Haifeng  LI Peng
Affiliation:1. State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University, Baoding 071003, China;2. State Key Laboratory of Power System, Tsinghua University, Beijing 100084, China
Abstract:This paper proposes a real-time evaluation method for power supply capacity of active distribution network with distributed generation (DG) based on the uncertainty of DG output and the cyclical change characteristics of power grid load. The method considers the situation with the access of various types of DG in distribution network and obtains the future load and DG output through prediction. The optimization model is established using the maximum load that can be supplied by distribution network as objective function and the safe operation requirements of the system as constraint conditions. Not only can a real-time evaluation of power supply capacity and power supply margin of distribution network be provided for a period of time in the future, but also can a series of power supply bottlenecks that restrict power supply capacity be given. The findings allow dispatchers to take corresponding measures in advance according to the evaluation results to ensure the safety and reliability of power grid operation. Additionally bottlenecks discovered can be reformed to explore the potential power supply capacity.
Keywords:distributed generation  active distribution network  power supply capacity  real-time evaluation  power supply bottleneck  
点击此处可从《中国电力》浏览原始摘要信息
点击此处可从《中国电力》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号