电泳槽玻璃钢衬里的施工过程
引用本文:王伟,岳丽霞.电泳槽玻璃钢衬里的施工过程[J].电镀与涂饰,2009,28(8).
作者姓名:王伟  岳丽霞
作者单位:机械工业第四设计研究院涂装工程所,河南,洛阳,471039
摘    要:介绍了电泳槽玻璃钢衬里施工的流程,包括材料的表面处理,刷底漆,涂防腐树脂,贴增强纤维布,树脂积层,防腐面处理,涂面层,检查及养护固化.指出了在材料检验、施工管理及安全防护等方面的注意事项.给出了玻璃钢涂层的检测步骤.

关 键 词:电泳槽  玻璃钢  衬里  施工

Construction of fiber reinforced plastic lining for electrophoresis tank
WANG Wei,YUE Li-xia.Construction of fiber reinforced plastic lining for electrophoresis tank[J].Electroplating & Finishing,2009,28(8).
Authors:WANG Wei  YUE Li-xia
Affiliation:WANG Wei*,YUE Li-xia Scivic Engineering Corporation,Luoyang 471039,China
Abstract:The construction process of fiber reinforced plastic lining for electrophoresis tank was introduced, including surface treatment of material, coating with primer, coating with anticorrosive resin, applying reinforced fiber sheet, brushing resin layer, anticorrosive surface treatment, coating with anticorrosive resin again, examination and curing. Some problems needing attention in material inspection, construction management and safety protection were pointed out. Checking and testing procedures for fiber r...
Keywords:electrophoresis tank  fiber reinforced plastic  lining  construction  