全尾砂胶结充填体的爆破振动破坏机制和振动速度阈值研究
引用本文:黄欣成,卢文波,张立新,严鹏,石磊.全尾砂胶结充填体的爆破振动破坏机制和振动速度阈值研究[J].爆破,2021,38(1):1-7.
作者姓名:黄欣成  卢文波  张立新  严鹏  石磊
作者单位:武汉大学 水资源与水电工程科学国家重点实验室,武汉430072;武汉大学 水工岩石力学教育部重点实验室,武汉430072;武汉大学 水资源与水电工程科学国家重点实验室,武汉430072;武汉大学 水工岩石力学教育部重点实验室,武汉430072;五矿矿业控股有限公司,合肥230091;武汉大学 水资源与水电工程科学国家重点实验室,武汉430072;武汉大学 水工岩石力学教育部重点实验室,武汉430072;安徽开发矿业有限公司,六安237426
基金项目:中央高校基本科研业务费专项资金资助;国家自然科学基金项目;湖北省自然科学基金杰出青年基金项目
摘    要:结合五矿矿业安徽李楼铁矿-425 m中段矿柱爆破回采工程实例,利用应力波理论,分析了爆炸应力波在全尾砂胶结充填体中的传播及其与介质界面的相互作用,基于充填体的冲击压剪、剪切和反射拉伸等不同破坏机制和破坏准则,研究了充填体的质点振动速度阈值.研究表明:在爆炸应力波作用下,矿柱与1:8充填体的胶结面易发生剪切破坏,而胶结充...

关 键 词:爆破振动  应力波理论  胶结充填体  破坏机制  质点振速

Study on Blasting Vibration Failure Mechanism and Vibration Velocity Threshold of Total Tailing Cemented Backfill
HUANG Xin-cheng,LU Wen-bo,ZHANG Li-xin,YAN Peng,SHI Lei.Study on Blasting Vibration Failure Mechanism and Vibration Velocity Threshold of Total Tailing Cemented Backfill[J].Blasting,2021,38(1):1-7.
Authors:HUANG Xin-cheng  LU Wen-bo  ZHANG Li-xin  YAN Peng  SHI Lei
Affiliation:(State Key Laboratory of Water Resources and Hydropower Engineering Science,Ministry of Education,Wuhan University,Wuhan 430072,China;Key Laboratory of Rock Mechanics in Hydraulic Structural Engineering,Ministry of Education,Wuhan University,Wuhan 430072,China;Minmetals Mining Holdings Co.,Ltd.,Hefei 230091,China;Anhui Development Mining Co.,Ltd.,Lu′an 237426,China)
Abstract:The pillar blasting stope project of 425 m medium stage in Lilou Iron Mine of Minmetals Mining was presented.Based on the stress wave theory,the propagation of blasting stress wave in total tailing cemented backfill and its interaction with medium interface were analyzed.According to the different failure criteria and mechanism of backfill,such as impact-compression-shear,shear and reflective tension,the particle vibration velocity threshold of backfill were studied.The research shows that the cementing surface between the pillar and the 1∶8 ratio backfill is prone to shear failure due to blast stress wave,and the cemented backfill is prone to compression-shear failure.Under the action of refracted and reflected stress wave,the cementing surface between the 1∶8 ratio and 1∶20 ratio backfill is prone to tensile failure,and the spall fracture of the 1∶8 ratio backfill adjacent to the 1∶20 ratio backfill may occur.The specific particle vibration velocity threshold of the backfill is summarized below:The particle vibration velocity threshold of shear failure on the cemented surface between the pillar and the 1∶8 ratio backfill is 27.6 cm/s;the particle vibration velocity threshold of compression-shear failure of 1∶8 ratio backfill adjacent to pillar is 172 cm/s;the particle vibration velocity threshold of tensile failure on the cementing surface between the 1∶8 ratio and 1∶20 ratio backfill is 12.6 cm/s.the particle vibration velocity threshold of spall fracture of the 1∶8 ratio backfill adjacent to the 1∶20 ratio backfill is 52.6 cm/s.
Keywords:blast vibration  stress wave theory  cementing backfill  failure mechanism  particle vibration velocity