杨房沟水电站导流隧洞进口围堰防渗施工
引用本文:刘涛,张俊德,赵东海.杨房沟水电站导流隧洞进口围堰防渗施工[J].人民长江,2016,47(20):55-57.
作者姓名:刘涛  张俊德  赵东海
作者单位:1. 中国水利水电第七工程局有限公司,四川 成都,610058;2. 长江水利委员会工程建设监理中心,湖北 武汉,430010
摘    要:杨房沟水电站导流隧洞进口围堰覆盖层主要为混合土卵石层及漂石混合土层,采取高压喷射灌浆和覆盖层帷幕灌浆相结合的方式进行防渗处理。详细介绍了高压喷射灌浆和覆盖层帷幕灌浆的施工工艺,施工难点及特殊情况的处理措施。工后质量检查以及围堰汛期挡水效果均表明联合防渗处理措施是成功的,其经验可为类似复杂覆盖层灌浆工程施工提供参考。

关 键 词:围堰防渗    高压喷射灌浆    覆盖层灌浆    杨房沟水电站  

Anti-seepage construction of cofferdam at diversion tunnel inlet of Yangfanggou Hydropower Station
Abstract:The cofferdam overlayer at the diversion tunnel inlet of Yangfanggou Hydropower Station is mainly composed of mixed soil pebble layer and boulder mixed soil layer, high-pressure jet-grouting and overlayer curtain grouting were combined in anti-seepage treatment. Construction techniques and difficulties of jet-grouting and overlayer curtain grouting, and treatment for special condition are introduced in detail. Post-construction quality inspection and the results of water retaining of the cofferdam in flood season proved that the anti-seepage scheme was successful, which can provide reference for grouting of similar complicated overlayer.
Keywords:anti-seepage of cofferdam  high-pressure jet grouting  overlayer grouting  Yangfanggou Hydropower Station  