华山沟电站防渗墙优化设计
引用本文:杨佳刚.华山沟电站防渗墙优化设计[J].湖北水力发电,2016(4):25-29.
作者姓名:杨佳刚
作者单位:湖北省水利水电规划勘测设计院,湖北武汉,430064
摘    要:介绍了华山沟电站技术施工阶段坝基土层防渗墙,在通过可行性分析之后,进行了优化设计,经计算和实测成果分析,采用悬挂式塑性混凝土防渗墙方案,这样既减少了防渗墙深度,又降低了工程造价,可为深覆盖层防渗墙设计提供一些参考。

关 键 词:深覆盖层  深层混凝土  悬挂式塑性混凝土  防渗墙

Optimization Design of the Cut-off Wall in Huashangou Hydropower Station
YANG Jiagang.Optimization Design of the Cut-off Wall in Huashangou Hydropower Station[J].Hubei Water Power,2016(4):25-29.
Authors:YANG Jiagang
Affiliation:YANG Jiagang;Hubei Provincial Water Resources and Hydropower Planning Survey and Design Institute;
Abstract:In the technical construction stage of Huashangou Hydropower Station , an optimization design is carried out for the cut-off wall in dam foundation after the feasibility study .With numerical calculations and analysis on in-situ measurements , the scheme of suspension-type plastic concrete cut-off wall is selected due to its shallower depth and less construction cost .It could be a useful reference to the design of cut-off walls in deep overburden layer foundation .
Keywords:deep overburden layer  deep concrete  suspension-type plastic concrete  cut-off wall