大跨度悬索桥主缆施工温度时变效应研究
引用本文:王达,张永健,黄平明.大跨度悬索桥主缆施工温度时变效应研究[J].公路交通科技,2010,27(12):72-77.
作者姓名:王达  张永健  黄平明
作者单位:1. 长沙理工大学,土木与建筑学院,湖南,长沙,410064
2. 湖南省高速公路管理局,湖南,长沙,410001
3. 长安大学,陕西,西安,710064
基金项目:长沙理工大学人才引进基金,长沙理工大学桥梁与隧道工程重点学科基金,湖南省高校科技创新团队支持计划资助项目
摘    要:大跨度悬索桥对温度场十分敏感,在主缆索股架设过程中这现象表现得尤为突出,通过对悬索桥结构温度时变效应计算理论的研究,给出了温度场布设方案及测试方法。以湖北某大跨度悬索桥为工程背景,对施工期间该桥的温度场进行了实时观测,得出了该悬索桥主塔及主缆的温度场。借助大型有限元计算程序ANSYS,通过对实测数据与理论计算结果的对比分析,验证了提出的温度场布设方案及测试方法的可行性。通过对不同温度场下的结构线形进行实时分析,得出了索塔及主缆索股在不同温度场下的线形及相应的变化规律,据此确定了的最佳调索时机,同时将分析所得的结果直接指导工程实践。结果表明:该方案及方法实用性强、精度高,具有较强的推广应用价值。

关 键 词:桥梁工程  悬索桥  热-结构耦合分析  温度效应
收稿时间:2009-08-20

Research on Temperature Time-varying Effect of Long-span Suspension Bridge during Main Cable Construction
WANG Da,ZHANG Yongjian,HUANG Pingming.Research on Temperature Time-varying Effect of Long-span Suspension Bridge during Main Cable Construction[J].Journal of Highway and Transportation Research and Development,2010,27(12):72-77.
Authors:WANG Da  ZHANG Yongjian  HUANG Pingming
Affiliation:1. School of Civil Engineering and Architecture, Changsha University of Science &; Technology, Changsha Hunan 410064, China; 2. Hunan Expressway Administration Bureau, Changsha Hunan 410001, China; 3. Changan University,Xian Shaanxi 710064, China)
Abstract:Long-span suspension bridge is extremely sensitive to the temperature, this phenomenon displays outstandingly in the process of main cable construction. The theory of temperature time-varying effect of suspension bridge was researched, the  arrangement and the test method of temperature field were given accordingly. Taken a long-span suspension bridge in Hubei as an example, the real-time observation of the bridge temperature field was performed during construction to obtain the temperature fields of main pylon  and main cable of the suspension bridge. With the aid of large-scale finite element computational software ANSYS, the measured data and computation result was compared to verify the feasibility of the presented arrangement and the test method. The main cable curve and its changing regularity under the different temperature field were obtained based on the related real-time analysis, and the optimum cable adjustment time was determined accordingly. The analysis result was used to instruct practice, and the result indicates  that this scheme and the method are of good practicability and higher precision, and valuable to be applied and popularized.
Keywords:bridge engineering  suspension bridge  thermal-structure coupling analysis  temperature effect