钢筋混凝土倒锥壳水箱提升施工工艺 |
| |
引用本文: | 任发亮. 钢筋混凝土倒锥壳水箱提升施工工艺[J]. 水泥工程, 2021, 34(1): 78-79 |
| |
作者姓名: | 任发亮 |
| |
作者单位: | 苏州中材建设有限公司 |
| |
基金项目: | thermal insulation water tank, inverted cone shell,water tank lifting, series connection, inversion, hydraulic jack |
| |
摘 要: | 文章详细介绍了双环梁串联倒置液压千斤顶法提升水箱至预定位置,用临时钢支架定位,然后浇筑混凝土环板作永久固定,完成水塔施工的工艺要点;并分析了此工艺带来的经济效益。
|
关 键 词: | 保温水箱,倒锥壳,水箱提升,串联,倒置,液压千斤顶 |
Lifting construction technology of reinforced concrete inverted cone water tank |
| |
Abstract: | The article introduces the method of lifting the water tank to a predetermined position with a double-ring beam series inverted hydraulic jack in detail, positioning it with a temporary steel support, and then pouring a concrete ring slab for permanent fixation to complete the technical points of the water tower construction; and analyzes the economics brought by this process benefit. |
| |