首页 | 官方网站   微博 | 高级检索  
     

第三方检测在黄登大坝碾压混凝土质量控制中的关键作用
引用本文:郭辉,李林,兰道银,石正国,郭文康.第三方检测在黄登大坝碾压混凝土质量控制中的关键作用[J].长江科学院院报,2021,38(5):153-158.
作者姓名:郭辉  李林  兰道银  石正国  郭文康
作者单位:1.长江科学院 工程质量检测中心,武汉 430010; 2.长江科学院 国家大坝安全工程技术研究中心,武汉 430010;3.华能澜沧江水电股份公司 黄登大华桥水电工程建设管理局,云南 怒江 671406
基金项目:中央级公益性科研院所基本科研业务费项目(CKSF2019166/JC)
摘    要:黄登大坝最大坝高202 m,是在建的世界第一高碾压混凝土重力坝。受地质条件及其他因素的影响,在建设过程中出现原材料质量波动、新版检测标准与旧版设计指标不匹配、粗骨料裹粉等一系列工程问题。介绍了第三方检测机构牵头解决上述工程问题的全过程,剖析了水利水电工程第三方检测如何发挥技术能力优势为工程提供优质附加服务,揭示了工程问题解决过程中第三方检测发挥的关键作用,为同类型工程建设提供有益的参考。

关 键 词:质量控制  第三方检测  黄登大坝  碾压混凝土  裹粉  
收稿时间:2020-03-20
修稿时间:2020-06-24

Key Role of Third Party Inspection in Quality Control of Roller- Compacted Concrete in Huangdeng Dam
GUO Hui,LI Lin,LAN Dao-yin,SHI Zheng-guo,GUO Wen-kang.Key Role of Third Party Inspection in Quality Control of Roller- Compacted Concrete in Huangdeng Dam[J].Journal of Yangtze River Scientific Research Institute,2021,38(5):153-158.
Authors:GUO Hui  LI Lin  LAN Dao-yin  SHI Zheng-guo  GUO Wen-kang
Affiliation:1. Engineering Quality Inspection Center, Yangtze River Scientific Research Institute,Wuhan 430010,China;2. National Research Center on Dam Safety Engineering Technology, Yangtze River Scientific Research Institute, Wuhan 430010,China; 3. Administration of Huangdeng & Dahuaqiao Hydropower Projects, Huaneng Lancang River Hydropower Co., Ltd., Nujiang 671406, China
Abstract:Huangdeng dam is the world’s tallest RCC (roller-compacted concrete) gravity dam under construction with a maximum height of 202 m. Affected by geological conditions and other factors, some engineering problems emerged in the construction process. Such problems include the quality fluctuation of raw materials, the contradiction between new test standard and original design indexes, as well as the coated-powder of aggregate. In this paper, the whole process of solving the above engineering problems by the third party inspection is introduced; the advantage of the third party inspection in additional quality control service is expounded, and the key role of the third party inspection in the quality control of RCC in Huangdeng Dam is revealed so as to offer reference for similar engineering construction.
Keywords:quality control  the third party inspection  Huangdeng dam  RCC  coated-powder  
本文献已被 CNKI 等数据库收录!
点击此处可从《长江科学院院报》浏览原始摘要信息
点击此处可从《长江科学院院报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号