首页 | 官方网站   微博 | 高级检索  
     

基于TIN的露天矿区地形精细模型构建研究
引用本文:王晨旭,胡引翠,王崇倡,田冰,王天宇,张文静.基于TIN的露天矿区地形精细模型构建研究[J].金属矿山,2019,48(9):147-153.
作者姓名:王晨旭  胡引翠  王崇倡  田冰  王天宇  张文静
作者单位:1. 河北省环境演变与生态建设实验室,河北 石家庄 050016;2. 河北师范大学资源与环境科学学院, 河北 石家庄 050016;3. 辽宁工程技术大学测绘与地理科学学院,辽宁 阜新 123000
基金项目:基金项目:河北省自然科学基金项目(编号:D2013205077)。
摘    要:准确构建露天矿区三维地形模型,客观反映露天矿在开采过程中的地形动态变化特征,对于提高露天矿生产管理效率和信息化水平具有重要意义。根据露天矿地形特点,提出了以凸壳算法为基础的建模方法。该方法中,以空间特征为约束条件构建三维地形精细模型。以三维地形精细模型为基准,针对地理信息软件ArcGIS中三维体积计算的局限性,提出了一种土方量计算的改进算法。以宝日希勒露天矿为例,结合矿区地形碎部点测绘数据,进行了三维地形精细模型构建。研究表明:该建模方法提升了三维地形模型的构建效率,同时以边为着眼点对三维地形模型进行优化,提高了模型的几何精度。通过对比分析不同时期露天矿三维地形模型的体积变化和形状变化情况,可为露天矿开采动态量化评估提供可靠依据。

关 键 词:露天矿  地形建模  凸壳算法  TIN  模型体积

Study on the Construction of Fine Open-pit Mine Terrain Model Based on TIN
WANG Chen-Xu,HU Yin-Cui-,WANG Chong-Chang,TIAN Bing,WANG Tian-Yu,ZHANG Wen-Jing.Study on the Construction of Fine Open-pit Mine Terrain Model Based on TIN[J].Metal Mine,2019,48(9):147-153.
Authors:WANG Chen-Xu  HU Yin-Cui-  WANG Chong-Chang  TIAN Bing  WANG Tian-Yu  ZHANG Wen-Jing
Affiliation:1. Laboratory of Environmental Evolution and Ecological Construction in Hebei Province,Shijiazhuang 050016, China;2. College of Resources and Environmental Science,Hebei Normal University,Shijiazhuang 050016,China; 3. Institute of Surveying and Mapping and Geographic Science,Liaoning Technical University,Fuxin 123000,China
Abstract:Accurately constructing the three-dimensional terrain of the open-pit mine and objectively reflecting the dynamic characteristics of the open-pit mine during the mining process are great significance for improving the efficiency and information level of the open-pit mine production management.According to the characteristics of the open-pit mine terrain,an improved modeling method was proposed based on the convex hell algorithm.In this method,the three-dimensional terrain fine model was optimized by using spatial features as constraints.Based on the three-dimensional terrain fine model,this article further proposed an improved algorithm for earthwork calculation against the limitation of three-dimensional volume calculation in geographic information software ArcGIS.Taking Baojixier open-pit mine as the experimental area,according to the the survey data of the topographical parts,the 3D terrain fine model construction verification experiment was carried out.The experimental results show that the modeling method can improve the construction efficiency of the 3D terrain model, and optimize the 3D terrain model with the edge as the focus which improves the geometric accuracy of the model.By comparing and analyzing the volume change and shape change of the three-dimensional terrain model of open-pit mine in different periods,it provides a basis for quantitative evaluation of open-pit mine mining situation.
Keywords:Open-pit mine  Terrain modeling  Convex hull algorithm  TIN  Model volume
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《金属矿山》浏览原始摘要信息
点击此处可从《金属矿山》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号