东乡铜矿Ⅶ号难采矿体采场顶板控制技术
引用本文:占丰林,杨建永,饶运章,黄文钿. 东乡铜矿Ⅶ号难采矿体采场顶板控制技术[J]. 南方冶金学院学报, 1996, 0(4)
作者姓名:占丰林  杨建永  饶运章  黄文钿
摘    要:论述了后退或压气罐长锚索注浆法.对东乡铜矿Ⅶ号难采矿体采场进行了长锚索控顶试验,解决了该矿采场顶板控制的难题.

关 键 词:冒顶,长锚索,后退式压气罐注浆

Stope Roof-control techniques of the Seventh Difficult-excavated Ore Body in Dongxiang Copper Mine
Zhang Fenglin,Yang Jiangyong,Rao Yunzhang ,Huang Wendian. Stope Roof-control techniques of the Seventh Difficult-excavated Ore Body in Dongxiang Copper Mine[J]. Journal of Southern Institute of Metallurgy, 1996, 0(4)
Authors:Zhang Fenglin  Yang Jiangyong  Rao Yunzhang   Huang Wendian
Affiliation:Department of Construction Engineering
Abstract:The method of retreating injected long cables using compressed-air tank isdiscussed. By means of stope roof-control experiment of the seventhdifficult-excavated ore body in Dongxiang Copper Mine, the stope roof-controlproblems of the mine are solved.
Keywords:Roof-fall   Long cable   Retreating injector using compressed-air tank