岭澳核电站反应堆压力容器和蒸汽发生器的制造及安装工艺的改进
引用本文:陈振伟.岭澳核电站反应堆压力容器和蒸汽发生器的制造及安装工艺的改进[J].核动力工程,2004,25(3):249-251.
作者姓名:陈振伟
作者单位:岭澳核电有限公司,广东,深圳,518124
摘    要:介绍岭澳核电站反应堆压力容器和蒸汽发生器制造及安装工艺的改进,并分析工艺改进的优点以及对工程建设所造成的影响。

关 键 词:核电站  反应堆  压力容器  蒸汽发生器  制造  安装  工艺改进
文章编号:0258-0926(2004)03-0249-03

Improvement of Fabrication and Installation Technology for Reactor Pressure Vessel and Steam Generator of Ling'ao Nuclear Power Station
CHEN Zhen-wei.Improvement of Fabrication and Installation Technology for Reactor Pressure Vessel and Steam Generator of Ling''''ao Nuclear Power Station[J].Nuclear Power Engineering,2004,25(3):249-251.
Authors:CHEN Zhen-wei
Abstract:The fabrication and installation technology improvement for primary equipment Reactor Pressure Vessel and Steam Generators on Ling'ao Nuclear Power Station is given. The advantage of these improvement and impacts on the construction of Ling'ao Nuclear Power Station is analyzed.
Keywords:Nuclear power station  Reactor  Pressure vessel  Steam generator  Manufacture  Installation  Technology improvement  