首页 | 官方网站   微博 | 高级检索  
     

掘采全过程沿空掘巷小煤柱应力分布研究
引用本文:郑西贵,姚志刚,张农.掘采全过程沿空掘巷小煤柱应力分布研究[J].采矿与安全工程学报,2012(4):459-465.
作者姓名:郑西贵  姚志刚  张农
作者单位:中国矿业大学矿业工程学院煤炭资源与安全开采国家重点实验室
基金项目:国家自然科学基金项目(51104152);中央高校基本科研业务费专项资金项目(2011QNB02);江苏高校优势学科建设工程项目
摘    要:基于理论分析、FLAC3D数值模拟及现场工程实践的方法,研究了不同宽护巷煤柱沿空掘巷掘采全过程的应力场分布规律,分析了煤柱宽度对沿空掘巷煤柱和实体帮应力演化的影响。提出确定沿空掘巷合理煤柱宽度时,不仅需考虑掘巷扰动影响,还应将本工作面的超前采动影响作为一个重要影响因素。研究结果表明:仅考虑掘巷扰动影响时,沿空掘巷煤柱宽度应大于6 m,此时掘巷稳定后围岩变形量较小;当考虑超前采动影响时,煤柱增加到8 m后不仅对控制回采期间沿空掘巷两帮变形量的作用不再显著增加,反而会使顶底板变形量增大,因此合理的护巷煤柱宽度为8 m。

关 键 词:掘采全过程  沿空掘巷  煤柱稳定性  应力分布  数值模拟

Stress Distribution of Coal Pillar with Gob-Side Entry Driving in the Process of Excavation & Mining
ZHENG Xi-gui,YAO Zhi-gang,ZHANG Nong.Stress Distribution of Coal Pillar with Gob-Side Entry Driving in the Process of Excavation & Mining[J].Journal of Mining and Safety Engineering,2012(4):459-465.
Authors:ZHENG Xi-gui  YAO Zhi-gang  ZHANG Nong
Affiliation:(School of Mines,State Key Laboratory of Coal Resources & Safe Mining, China University of Mining & Technology,Xuzhou,Jiangsu 221116,China)
Abstract:The stress distribution of coal pillar with different width in the stage of excavation and min-ing was studied based on the theory analysis,numerical simulation,engineering practice,the similarities and differences of stress evolution of coal pillar and entity sidewall caused by different width of coal pillar was analyzed.The opinion was put forward that the infection of roadway driving and coal mining need considered simultaneously when determination the reasonable width for coal pillar.The results show that the proper width of coal pillar should large than six meters for the deformation is attenuation with the increased with of coal pillar.However,the increased width coal pillar such as eight meters not only have reduced contribution ratio to control the sidewall deformation in the stage of coal mining,but also caused top and floor deformation increased.Therefore,the reasonable width of coal pillar is eight meters.
Keywords:whole process of excavation and mining  gob-side entry driving  stability of coal pillar  stress distribution  numerical simulation
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号