宁海电厂1000MW塔式锅炉钢架吊装
引用本文:张宝龙,陈鹏毅,沈建强.宁海电厂1000MW塔式锅炉钢架吊装[J].电力建设,2009,30(4):77-79.
作者姓名:张宝龙  陈鹏毅  沈建强
作者单位:天津电力建设公司
摘    要:浙江国华宁海电厂二期2×1000 MW工程采用了1000 MW塔式锅炉,该类型锅炉吊装中的技术工艺尚处于探索阶段。文章介绍了该工程锅炉钢架吊装机械的选用、吊装工艺及创新、关键点质量控制等内容,供类似工程参考。

关 键 词:超超临界机组  塔式锅炉  钢架  吊装

Hoisting and Installation of 1000 MW Tower-type Boiler Steel Frame of Ninghai Power Plant
ZHANG Bao-long,CHEN Peng-yi,SHEN Jian-qiang.Hoisting and Installation of 1000 MW Tower-type Boiler Steel Frame of Ninghai Power Plant[J].Electric Power Construction,2009,30(4):77-79.
Authors:ZHANG Bao-long  CHEN Peng-yi  SHEN Jian-qiang
Affiliation:Tianjin Electric Power Construction Company;Tianjin 300041;China
Abstract:1 000 MW tower-type boiler is used in Zhejiang Guohua Ninghai Power Plant Phase II, 2 ×1 000 MW project. The hoisting and installation technique of this type of boiler are still under exploration. The selection of hoisting machinery, technology, innovation, and quality control of key points in the installation of boiler steel frame are introduced, which provides reference for similar projects.
Keywords:USC unit  tower-type boiler  steel frame  hoisting and installation  