首页 | 官方网站   微博 | 高级检索  
     

引子渡水电站的设计与优化
引用本文:杨志雄,胡世奎.引子渡水电站的设计与优化[J].大坝与安全,2004(2):11-15.
作者姓名:杨志雄  胡世奎
作者单位:国家电力公司贵阳勘测设计研究院,贵州,贵阳,550002;国家电力公司贵阳勘测设计研究院,贵州,贵阳,550002
摘    要:本文介绍了在设计中通过坝型选择,枢纽布置调整,不断进行设计优化,为降低工程投资、缩短建设工期、高质量快速建成该电站所做的工作。

关 键 词:引子渡水电站  设计  优化
文章编号:1671-1092(2004)02-0011-05
修稿时间:2004年3月3日

Designing and optimizing design on Yinzidu hydropower station
by YANG Zhi-xiong and HU Shi-kuiGuiyang Hydro-electric Investigation Design and Research Institute.Designing and optimizing design on Yinzidu hydropower station[J].Large Dam & Safety,2004(2):11-15.
Authors:by YANG Zhi-xiong and HU Shi-kuiGuiyang Hydro-electric Investigation Design and Research Institute
Affiliation:by YANG Zhi-xiong and HU Shi-kuiGuiyang Hydro-electric Investigation Design and Research Institute
Abstract:Yinzidu hydropower station is one of the first group of west-electricity-transmitted-to-the-east projects.In designing,we have continuously optimized design by selecting dam type and regulating hydraulic layout and so on,which made a great contri-bution to project construction in high quality,lower investment and short construction stage.
Keywords:Yinzidu hydropower station  design  optimizing
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号