首页 | 官方网站   微博 | 高级检索  
     

库车坳陷山前构造超深井岩石可钻性研究
引用本文:熊继有,蒲克勇,周健. 库车坳陷山前构造超深井岩石可钻性研究[J]. 天然气工业, 2009, 29(11): 59-61. DOI: 10.3787/j.issn.1000-0976.2009.11.018
作者姓名:熊继有  蒲克勇  周健
作者单位:1.“油气藏地质及开发工程”国家重点实验室·西南石油大学;2.中国石油塔里木油田公司勘探事业部
基金项目:国家自然科学基金资助项目( 
摘    要:根据地层岩石可钻性级值预测钻井速度、制订钻井计划是科学钻井的一项重要内容。精确地预测地层可钻性是实现超深井优质高效钻井的重要基础之一,对提高钻井速度、降低钻井成本具有十分重要的意义。应用数理统计的方法,依据库车坳陷山前构造已完钻井的钻井、录井、测井资料,以及室内微钻头可钻性实验数据统计分析,建立了库车坳陷山前构造超深井横向、纵向地层岩石可钻性剖面,较精确地预测了地层可钻性级值,满足了现场钻井工作的需要。并编制了设计计算软件,现场应用表明预测值与实测值误差为5%~8%,具有广泛的推广应用价值,对于不同地区、不同构造,应对地层岩石可钻性剖面进行修正,以获得最佳的技术经济效益。

关 键 词:山前构造  超深井  录井  测井  岩石可钻性  钻井成本

Rock drillability investigation for ultra-deep well drilling at thrust structure of Kuqa depression
XIONG Ji-you,PU Ke-yong,ZHOU Jian. Rock drillability investigation for ultra-deep well drilling at thrust structure of Kuqa depression[J]. Natural Gas Industry, 2009, 29(11): 59-61. DOI: 10.3787/j.issn.1000-0976.2009.11.018
Authors:XIONG Ji-you  PU Ke-yong  ZHOU Jian
Affiliation:1.State Key Laboratory of Oil & Gas Reservoir Geology and Exploitation, Southwest Petroleum University, Chengdu 610500, China; 2.Exploration Division, PetroChina Tarim Oilfield Company, Korla 841000, China
Abstract:It is an important part in scientific drilling to predict the drilling speed and make out drilling plans according to the rock drillability grades. Then the precise prediction of rock drillability is one of the key fundamentals especially for high-quality and high-efficiency ultradeep well drilling, thus to improve the ROP and reduce costs. Therefore, by use of the mathematical statistical method, based on the drilling, logging and mud data obtained from wells already completed at the thrust structure at the Kuqa depression and the statistical analysis of experiment data on micro-bit drillability, we established the rock drillability profiles in both vertical and horizontal direction for ultra-deep drilling at the thrust structure at the Kuqa depression. Thus, the rock drillability can be predicted rather accurately, which can meet the needs of drilling on site. Meanwhile, a software is then developed for design calculation. The application of the drillability profiles and this software proves that the error between the calculated value and the actual drilling data is 5 -8%, so they can be widely used. To achieve the most technical and economical benefits,the rock drillability profiles can be adjusted according to different areas and structures.
Keywords:thrust structure  ultra-deep well  mud logging  wireline logging  rock drillability  drilling cost  mathematical statistical method  formation  prediction
本文献已被 万方数据 等数据库收录!
点击此处可从《天然气工业》浏览原始摘要信息
点击此处可从《天然气工业》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号