Analysis of the manufacturing lead time in a production system with non-renewal batch input,threshold policy and post-operation |
| |
Authors: | Ho Woo Lee No Ik Park Se Won Lee |
| |
Affiliation: | 1. Department of Systems Management Engineering, Sungkyunkwan University, Suwon 440-746, South Korea;2. BcN Architecture Team, BcN Research Division, ETRI, Daejon, South Korea |
| |
Abstract: | In this paper, we analyze the manufacturing lead time in a production system with BMAP (Batch Markovian Arrival process) input and post-operation operated under the N-policy. We use the factorization principle to derive the waiting time distribution (hence the manufacturing lead time) and the mean performance measures. A numerical example is provided. |
| |
Keywords: | Non-renewal input N-policy Waiting time |
本文献已被 ScienceDirect 等数据库收录! |
|