混凝土工程夏季施工质量保证措施
引用本文:钱达友. 混凝土工程夏季施工质量保证措施[J]. 山西建筑, 2009, 35(14): 185-186
作者姓名:钱达友
作者单位:江苏省盐城建筑工程学校,江苏,盐城,224006
摘    要:分析了高温和多雨对混凝土工程的施工和质量产生的不利影响,指出实际工作中,针对高温可采取优选原材料、降低骨料温度、降低混凝土温度等措施;针对多雨可采取主动防雨和被动防雨措施,以保证夏季混凝土工程的施工和质量。

关 键 词:混凝土  施工  高温  多雨  质量  措施

The quality guaranteeing measures of concrete engineering summer construction
QIAN Da-you. The quality guaranteeing measures of concrete engineering summer construction[J]. Shanxi Architecture, 2009, 35(14): 185-186
Authors:QIAN Da-you
Affiliation:QIAN Da-you
Abstract:The unfavorable influence of high temperature and heavy rain on concrete engineering construction and quality was analyzed.It pointed out in practical work,against to high temperature,the measures that selection raw material,reduced skeletal material and concrete temperature can be adopted,while against to heavy rain,the active and passive rain proofing measures can be obtained,therefore guaranteed the construction and quality of summer concrete engineering.
Keywords:concrete  construction  high temperature  heavy rain  quality  measures  